SSK 2.5 | Version 1.08

Assembly and connecting

7

Assembly and connecting

The sandblasting cabinet may only be set up and opera

-

ted in dry, well-ventilated rooms. 

It must be set up stable on a level and firm ground. 

It is important to ensure that there is enough freedom of 
movement and sufficient lighting to work.

7.1 Assembly

The Sandblasting cabinet has to be mounted as shown 
in (Fig. 8).

Step 1:    Remove all loose parts and the grille from the 

inside of the sandblasting cabin housing.

Step 2:     Put the housing on its side.

Step 3:    Screw the four feet to the housing with the en

-

closed M6x12 screws, spacers and nuts. Hand 
tighten nuts. 

Step 4:    Die Sandstrahlkabine auf die Füße stellen.

Step 5:    Put the housing on its side . 

Step 6:    Place the pedal between the front feet and 

connect the leads.

Step 7:     Fit the side doors to the cab.

Step 8:     Insert the inspection window on the cabin top.

Step 9:      Secure the lights to the cabin top with the four 

enclosed screws, spacers and nuts.

Step 10:   Screw the exhaust system to the rear of the 

cab. Insert the motor and the filter into the top 
of the extraction system housing. 
Remove the hood cover on the cab, insert the 
pipe and seal with sealant. hen secure the 
corner with the suction tube again.

Step 11:    Tighten all screws and nuts.

Step 12:    Insert the storage rack into the cabin and 

guide the lines up through the opening.

Step 13:    Connect the electrical cable of the suction de

-

vice to the connection socket of the lighting 
and connect the plug of the lighting to the po

-

wer supply. When the suction switch is swit

-

ched on, the light switch simultaneously swit

-

ches on the suction and the lighting.

Step 14:    Fill the blasting abrasive through the storage 

grid into the funnel of the sandblasting cabi

-

net.

7.2 Electrical connection

Step 1:   Check if the mains voltage corresponds to the 

voltage indicated on the nameplate.

Step 2:   Ensure a good grounding of the sand blasting 

cabin. 

 

Fig. 4: ground connection

Step 3:   Connect the power cord to the mains. 

7.3 Compressed air connection

To operate the sand blasting cabin you need a compres

-

sor with at least 200-350 Liters/min Filling capacity and a 
container size of at least 100 Liters.The generated air 
must be cleaned, free of condensate and oil-free. 

Adjustable operating pressure: ca. 4,1 - 8,0 bar.

Use safety gloves!

Use safety schoes!

Use protective clothing!

ATTENTION!

crushing!

Injuries to hands and fingers may result from 
improper use of the sandblasting cabin.

-  Pay attention to stable supports and support de

-

vices.

DANGER!

Danger of life by electric current!

There is an immediate danger of electrocution on 
contact with live components..

Work on the electrical system only by electricians.

ATTENTION!

The sand blasting cabin must have a good groun

-

ding to avoid static electricity and sparking.

ATTENTION!

Moisture in the compressed air impairs the flow of 
abrasive and can cause clogging and clogging of val

-

ves and line!

Содержание SSK 2.5

Страница 1: ...SSK 2 5 Operating Instructions Sandblasting Cabinet SSK 2 5 SSK 2 5...

Страница 2: ...a tion Subject to technical modifications and error Content 1 Intorduction 3 1 1 Copyright 3 1 2 Customer Service 3 1 3 Limitation of liability 3 2 Safety 3 2 1 Symbol explanation 3 2 2 Obligations of...

Страница 3: ...dge gained from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liability All information and notes in these operating instructi...

Страница 4: ...ar intervals and in form them about the hazards The operator must provide the necessary protec tive equipment to the staff and order the use of the necessary protective equipment in a binding way Furt...

Страница 5: ...al protec tive equipment while performing different tasks on and with the machine which are indicated in the individual paragraphs of these instructions The personal protective equipment is explained...

Страница 6: ...herwise is considered misuse For structural and technical changes to the sand blasting cabin the company St rmer Maschinen GmbH assumes no liability Claims of any kind due to damage due to improper us...

Страница 7: ...p and given to the recycling collection The film is made of polyethylene PE and the cushioned parts of polystyrene PS These materials should be taken to a collection point for recyclable materials or...

Страница 8: ...ing Step 13 Connect the electrical cable of the suction de vice to the connection socket of the lighting and connect the plug of the lighting to the po wer supply When the suction switch is swit ched...

Страница 9: ...entration im pairing illnesses The sandblasting cabin may only be operated by one person Other persons must keep away from the work area during operation ATTENTION HEALTH HAZARD Inhalation of abrasive...

Страница 10: ...pressed air supply compressor Make sure that the maximum pressure is not exceeded Adjust according to the sensitivity of the mate rial according to lower working pressure Step 4 Connect the sandblast...

Страница 11: ...e nozzle In case of uneven wear the nozzle should be rotated by 1 4 turn every 10 operating hours To ensure a good flow of blasting media the compres sed air must be dry and free of oil Regularly chec...

Страница 12: ...ION If any of the following errors occur immediately stop working with the sandblasting gun It can cause serious injury or damage to the tool All repairs or replacement work must only be carried out b...

Страница 13: ...asting cabin Example The filter for the suction device of the sandblasting cabin must be ordered Type of device Sandblasting cabin SSK 2 5 Item number 6204003 Position number 56 The order number is 0...

Страница 14: ...pare parts drawing In case of service the following drawing shall help to identify the necessary spare parts If necessary send a copy of the parts drawing with the marked components to your authorised...

Страница 15: ...Electrical wiring diagram SSK 2 5 Version 1 08 15 13 Electrical wiring diagram Fig 9 Electric wiring diagram SSK 2 5...

Страница 16: ...ines General principles of design Risk evaluation and Risk reduction DIN EN 60204 1 2007 06 Safety of machines Electrical equipment of machines Part 1 General requirements DIN EN ISO 13849 1 2015 Safe...

Страница 17: ...ur Reinigung d rfen keine chemischen Reinigungsmittel eingesetzt werden da diese das Material besch digen k nnen Empfohlen Lappen und Wasser Die Handschuhe m ssen vor jedem Gebrauch auf Unversehrtheit...

Страница 18: ...www unicraft de...

Отзывы: