![unicraft SSK 2.5 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/unicraft/ssk-2-5/ssk-2-5_operating-instructions-manual_3754346008.webp)
8
SSK 2.5 | Version 1.08
Assembly and connecting
7
Assembly and connecting
The sandblasting cabinet may only be set up and opera
-
ted in dry, well-ventilated rooms.
It must be set up stable on a level and firm ground.
It is important to ensure that there is enough freedom of
movement and sufficient lighting to work.
7.1 Assembly
The Sandblasting cabinet has to be mounted as shown
in (Fig. 8).
Step 1: Remove all loose parts and the grille from the
inside of the sandblasting cabin housing.
Step 2: Put the housing on its side.
Step 3: Screw the four feet to the housing with the en
-
closed M6x12 screws, spacers and nuts. Hand
tighten nuts.
Step 4: Die Sandstrahlkabine auf die Füße stellen.
Step 5: Put the housing on its side .
Step 6: Place the pedal between the front feet and
connect the leads.
Step 7: Fit the side doors to the cab.
Step 8: Insert the inspection window on the cabin top.
Step 9: Secure the lights to the cabin top with the four
enclosed screws, spacers and nuts.
Step 10: Screw the exhaust system to the rear of the
cab. Insert the motor and the filter into the top
of the extraction system housing.
Remove the hood cover on the cab, insert the
pipe and seal with sealant. hen secure the
corner with the suction tube again.
Step 11: Tighten all screws and nuts.
Step 12: Insert the storage rack into the cabin and
guide the lines up through the opening.
Step 13: Connect the electrical cable of the suction de
-
vice to the connection socket of the lighting
and connect the plug of the lighting to the po
-
wer supply. When the suction switch is swit
-
ched on, the light switch simultaneously swit
-
ches on the suction and the lighting.
Step 14: Fill the blasting abrasive through the storage
grid into the funnel of the sandblasting cabi
-
net.
7.2 Electrical connection
Step 1: Check if the mains voltage corresponds to the
voltage indicated on the nameplate.
Step 2: Ensure a good grounding of the sand blasting
cabin.
Fig. 4: ground connection
Step 3: Connect the power cord to the mains.
7.3 Compressed air connection
To operate the sand blasting cabin you need a compres
-
sor with at least 200-350 Liters/min Filling capacity and a
container size of at least 100 Liters.The generated air
must be cleaned, free of condensate and oil-free.
Adjustable operating pressure: ca. 4,1 - 8,0 bar.
Use safety gloves!
Use safety schoes!
Use protective clothing!
ATTENTION!
crushing!
Injuries to hands and fingers may result from
improper use of the sandblasting cabin.
- Pay attention to stable supports and support de
-
vices.
DANGER!
Danger of life by electric current!
There is an immediate danger of electrocution on
contact with live components..
Work on the electrical system only by electricians.
ATTENTION!
The sand blasting cabin must have a good groun
-
ding to avoid static electricity and sparking.
ATTENTION!
Moisture in the compressed air impairs the flow of
abrasive and can cause clogging and clogging of val
-
ves and line!
Содержание SSK 2.5
Страница 1: ...SSK 2 5 Operating Instructions Sandblasting Cabinet SSK 2 5 SSK 2 5...
Страница 18: ...www unicraft de...