background image

Check the crane scale

KW-Series | Version 1.03

17

Fig. 7: Dimensions of lifting eye  

In accordance with DIN 15405 Part 1, the load hook and the 
lifting eye must be replaced with a widening of more than 
10%. 

 

10 Check the crane scale

The use of the crane scales is possible after:

UVV "Winches, Hoists and Pulling Devices" DGUV regu-
lation 54, UVV "Krane" DGUV regulation 52-Testing in 
accordance with DGUV regulation 54 (BGV D8 § 23 
(VBG 8 § 23)) by an expert before the first commissio-
ning and after significant changes 

Examination according to DGUV regulation 52 (BGV D6 
§ 25 (VBG 9 § 25) by an authorized expert before the 
first commissioning and after significant changes. 

Recurring inspections of equipment, cranes and suppor-
ting structures by an expert once a year. In severe condi-
tions, e.g. frequent operation with full load, dusty or ag-
gressive environment, high switching frequency, high 
duty cycle, the test intervals must be shortened.

Expert

 for the inspection of cranes, apart from the 

experts of the TÜV, only the experts authorized by 
the professional associations are.

Experts

 are customer service technicians of the ma-

nufacturer or specially trained specialist personnel.

The check of the crane scale must be verified by a log 
book.

The test is essentially a visual and functional test. It 
covers the examination of the condition of the compo-
nents and equipment, the completeness and effective-
ness of the safety equipment and the completeness of 
the test book.

Model

KW 5

KW 10

Load capacity KW

5 t

10 t

Load capacity eyelet

13,5 t

17,5 t

Width L [mm]

160

175

Width E [mm]

36

39

Length C [mm]

127

142

Strength N [mm]

35

37

Diameter B [mm]

33,5

34

Opening width A [mm]

60,5

61

Strength D [mm]

36,5

39

Width F [mm]

84,5

92

Safety factor eyelet

4:1

4:1

ATTENTION!

Only use original parts from the manufacturer of the 
hoist as a replacement.

Содержание KW 50

Страница 1: ...KW S ERIES KW 50 Operating Instructions Crane scale KW 50 KW 100...

Страница 2: ...2 1 Symbol explanation 3 2 2 Obligations of the operating company 4 2 3 Requirements to staff 5 2 4 Personal protective equipement 5 2 5 General safety regulations 6 2 6 Safety information of operatin...

Страница 3: ...We are always interested in valuable experience and knowledge gained from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liabil...

Страница 4: ...ecessary The operating company must unambiguously reg ulate and determine the responsibilities for instal lation operation troubleshooting maintenance and cleaning The operating company must ensure th...

Страница 5: ...ct our cus tomer service for the execution of all arising work 2 4 Personal protective equipment The personal protective equipment serves to protect per sons against impairments of safety and health w...

Страница 6: ...ility Insurance Association the Central Agency for Accident Prevention the Test Guidelines and the test regulations according to DIN 685 Part 5 Nov 1981 UVV DGUV Regulation 54 and UVV DGUV Regulation...

Страница 7: ...cidents or damage caused by these resi dual risks Risk of crushing of upper and lower limbs while equipment is operating During set up and adjustment works it may be come necessary to remove safety de...

Страница 8: ...kaging All used packaging materials and packaging aids are recyclable and should be taken to a materials recycling depot to be disposed of The delivery packaging is made of cardboard so please dispose...

Страница 9: ...alling or whose parts are not firmly connected Never use a rusted or damaged Crane scale Never leave a load lifted by the crane scale unatten ded When lifting or lowering a load make sure that the ope...

Страница 10: ...lifted with the Crane scale Do not make any sudden changes in the direction of movement Never hang heavy loads for long periods of time to minimize the load on the crane scale and prevent accidents W...

Страница 11: ...t is lb kg kg Lights when the unit is kg Report stands for Annotation The weight is above the defi ned range Determination of the weight stabilization phase The weight is below the defi ned range SETU...

Страница 12: ...off The Symbol TARE shines a The balance must not be locked otherwise the symbol will be displayed Locking unlockingif you want to lock the scale The symbol Step 1 Press or if you want to lock the sc...

Страница 13: ...t 2000 to 3000 divisions Step 3 The default resolution will be restored the next time the balance is turned on or user settings are made If you want to use the changes later then save the new resoluti...

Страница 14: ...the safety of the hook is closed NOTE The automatic shutdown can be set to the following values 0 never 5 min 15 min 30 min 60 min ATTENTION The Auto Off feature maximizes battery life It starts the...

Страница 15: ...ry should be stored bet ween 20 C 4 F and 50 C 122 F The bat tery should be charged every three months 6 When charging the battery the green charging indica tor light comes on If the lamp is red charg...

Страница 16: ...r the load hook After each use Relieve the crane scales immedi ately after each use Oil the load hook and the lifting eye well 40 hours Lubricate all bearings upon need Replacement of lifting eye and...

Страница 17: ...d dusty or ag gressive environment high switching frequency high duty cycle the test intervals must be shortened Expert for the inspection of cranes apart from the experts of the T V only the experts...

Страница 18: ...ale for repair Display does not show 0 after discharge Tare set Warm up time of the Crane scale too short 1 Set tare 2 Longer warm up time The Button The button re mains pressed after being pressed 1...

Страница 19: ...ispatched at the discretion of the supplier Information about the device type item number and year of manufacture can be found on the type plate The type plate is mounted on the device Example The loa...

Страница 20: ...ing should help you to identify necessary spare parts in case of service If necessary send a copy of the parts drawing with the marked components to your authorized dealer Fig 8 Spare parts drawing 14...

Страница 21: ...Electrical wiring diagram KW Series Version 1 03 21 Circuit diagram Fig 10 Circuit diagram of KW 50 and KW 100...

Страница 22: ...cluding any changes in force at the time of declaration Relevant EU directives 2014 35 EU Low Voltage Directive The following harmonized standards were applied DIN EN ISO 12100 2010 Safety of machines...

Страница 23: ...n 1 03 23 16 Maintenance plan Maintenance plan KW 40 h 200 h Requirement yearly Lubricate bearings wear measurement Lifting eye hook replacement Lifting eye hook Sicherheitspr fung Crane scale Date Op...

Страница 24: ...www unicraft de...

Отзывы: