When the unwind rope limiter switches off the electrical 
cable winch, the circuit is interrupted and the machine is 
stopped.

If the electrical cable winch cannot lift a weight immedi-
ately, switch off the electrical cable winch immediately to 
avoid damage and accidents.

Ensure that the suspension rope is not deflected by more 
than 15° and is not pulled or fastened over sharp edges! 
(Risk of damage to the rope).

The direction of unwinding must always correspond to 
the switch position, otherwise the electrical limit switch 
will not function if it is not observed and serious damage 
may be caused to the unit!

If the electrical cable winch is not in operation, it must al-
ways be disconnected from the mains supply.

8.1 Operating conditions

The working area must be dry, fire and explosion pro-
tected and free of any corrosive or poisonous sub-
stances. 

The electrical cable winch must not be used to lift or 
move dangerous goods such as molten, poisonous or ra-
dioactive materials.

The electrical cable winch may be used outdoors, but not 
in heavy rain.

Work duty: S3-20% 10 min

Working cycle 10 minutes, of which 2 minutes operating 
time and 8 minutes resting time for cooling down.

8.2 Test run

Before using the the electrical cable winch to lift a load, a 
no-load test should be carried out to test all functions. In 
particular, the function of the raising and lowering limits 
should be tested.

8.3 Raising a load

 

Step 1: Check that the electrical cable winchand the rope 

are in perfect and undamaged condition.

Step 2: Attach the winch load hook to a suitable load at-

tachment point and check that the hook securing 
device is closed.

Step 3: Check that the load is securely attached to the 

hook. Always stay away from the load and steel 
cable during operation.

Step 4: First drive upwards only until the load rope is ten-

sioned.

Step 5: First lift the load only a small piece and check 

that the rope and load are stable.

Step 6: Lift the load slowly and evenly.

ESW

Temperature range [°C]

0 to +50

Operating altitude

 max. 1000m MASL

Operating environment

as closed rooms as pos-
sible, non-flammable en-
vironment, as dry and 
dust-free as possible.

ATTENTION!

The electrical cable winch may only be connected to 
230 V alternating current!

ATTENTION!

-  Take care that no person is in vicinity or in line of 

the cable behind the the electrical cable winch, 
when the the electrical cable winch is under load.

-  Make sure that the route of load is free from              

barriers. 

-  Avoid swinging the load. 

-  The limit switches must not be approached during 

operation.

NOTE!

-  Do not wrap the rope around the load.

-  Check the position of the centre of gravity of the at-

tachment point to prevent movement and slipping of 
the load.

-  Lifting equipment (eye, chain or similar) must be 

loosely positioned at the bottom of the hook. 

-  The tip of the hook must not be loaded. 

-  Close the fuse.

NOTE!

-  The operator must have sufficient stability and free-

dom of movement. 

-  The electrical cable winch must be able to swing 

freely in the pulling direction. 

-  Limit switch-off: When the limit of the lifting travel is 

reached, the power supply switches off automati-
cally and the load hook stops.

-  The load hook is designed in such a way that it de-

forms when overloaded and does not break brittle.

Содержание ESW Series

Страница 1: ...ESW 500 Operating Instructions Electrical Cable Winch ESW 500 ESW 800...

Страница 2: ...l explanation 3 2 2 Obligations of the operating company 4 2 3 Requirements to staff 5 2 4 Personal protective equipment 5 2 5 Safety devices 5 2 6 Safety labels 6 2 7 General safety regulations 6 2 8...

Страница 3: ...ence and knowledge gained from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liability All information and notes in these oper...

Страница 4: ...ing manuals prepared by her correspond to the current status of the regulations and must adapt these if necessary The operating company must unambiguously regu late and determine the responsibilities...

Страница 5: ...onnel of the manufacturer Other personnel is not au thorized to perform these works Please contact our cu stomer service for the execution of all arising work 2 4 Personal protective equipment The per...

Страница 6: ...hat the maxi mum load is never exceeded Personnel must not stand underneath a suspended load as this could come loose and fall Personnel must not ride on or be lifted by the equipment Access to liftin...

Страница 7: ...served any reasonably fore seeable misuse which could lead to hazardous situations with personal damage is impossible with the electrical cable winch 3 2 Residual risks Even if all safety regulations...

Страница 8: ...ooks after your region 5 3 Storage Clean the electrical cable winch oil the bearings and store them in a frost free and dry environment max 55 C Do not place anything on the electrical cable winch 6 D...

Страница 9: ...Risk of crushing If improper work is carried out on the electrical cable winch there is a risk of injury to fingers and hands ATTENTION The carrier must be designed for the weight of the device and fo...

Страница 10: ...equipment which has suffi cient load bearing capacity to withstand the weight of the load and the Electrical Cable Winch If the load bearing capacity is exceeded the Electri cal Cable Winch may fail a...

Страница 11: ...aged condition Step 2 Attach the winch load hook to a suitable load at tachment point and check that the hook securing device is closed Step 3 Check that the load is securely attached to the hook Alwa...

Страница 12: ...ontact data on chapter 1 2 Customer service Immediately reassemble all protective and safety equip ment after completing the repair and maintenance of the device NOTE The rope must not be completely u...

Страница 13: ...rs or 10 000 load cycles under heavy operating conditions at shorter intervals Particular checks should be made on the links espe cially contact points for wear deformation wire breaks structural chan...

Страница 14: ...in addition to the T V experts Specialists are customer service fitters of the manu facturer or specially trained technical personnel The inspection shall be documented in an inspection book The test...

Страница 15: ...ocal waste disposal authority Consult a specialist disposal agent for recycling if needed 12 3 Disposal of lubricants Remove any leaking used or excessive grease at the lu bricating points Disposal no...

Страница 16: ...r of manufacture on the type plate fixed to the device Example The load hook for the electrical cable winch ESW 500 must be ordered The load hook is identified in the spare parts drawing with the numb...

Страница 17: ...parts drawing In case of service the following drawing shall help to identify the necessary spare parts If necessary send a copy of the parts drawing with the marked components to your authorised deal...

Страница 18: ...18 ESW Series Version 1 08 Electrical Circuit Diagram 14 Electrical Circuit Diagram Fig 11 Electrical circuit diagram ESW 500 and ESW 800...

Страница 19: ...elevant regulations of the aforementioned directive as well as any other applicable directives subse quently added including the changes applicable at the time the declaration was made Relevant EU dir...

Страница 20: ...ESW 40 h 40 h 200 h As re quired 200 h As re quired An nually Lubricate bearings gears Functional check brake system Wear test brake disc Replacement brake disc Wear measurement load rope hook Replace...