UM220-IV M0 User Manual
4
Please check the contents of the package carefully after receiving the package of
UM220-IV M0:
UM220-IV M0 EVK suite
(
with AC Adapter
)
UM220-IV M0 User manual.
uSTAR application package.
Antenna.
Antenna connection cable
Direct serial cable
PC
Please keep the box and anti-static plastic bags for storage and handling.
2.2
Hardware Installation
After the above preparation is complete, follow the steps below to install:
Step 1
:
Make sure to make full anti-static measures, such as anti-static wrist strap,
grounding the workbench;
Step 2
:
Open the UM220-IV M0 evaluation kit;
Step 3
:
S
elect the GNSS antenna with appropriate gain, fix it in the non-block area,
using the appropriate cable to connect the antenna with UM220 EVK;
Step 4
:
Connect the PC to the EVK serial port through direct serial cable;
Step 5
:
Power the evaluation board and initialize the UM220-IV M0;
Step 6
:
Open the uSTAR
Step 7
:
Controlled the receiver through uSTAR to display constellations view, log
messages, and receiver status.