34
Installation instructions
2 1
5
6
3
4
Probe insertion sequence
Following this sequence, insert the probes of the instruments
in the bulb holder/s on the top of the boiler (Ref. fig. 35): of the
thermometer (pos.1), of the working thermostat (pos. 2), of the
safety thermostat (pos. 3), of the minimum thermostat (pos. 4).
It is recommended to insert the probes all the way in the relative
bulb holders for best contact. Then insert the contact spring (pos.
6) and fasten the capillaries with the spring/s (pos. 5).
fig. 35