20
3.7 - ASSEMBLY INSTRUCTIONS
IMPORTANT!
Before beginning the casing work, perform the hydraulic testing of the boiler and of the plant connected to it.
When installing the boiler, consider the size of the pellet tank on the left side (refer to the dimensions on page 10)
and leave sufficient space for loading pellets in this tank.
As an indication, there should be a clearance of no less than 1000 mm between the boiler and any wall on
the left side for standing next to the tank and to fill it easily.
Assemble the expansion vessel.
3
2
1
Assembly of internal components
A) Check the correct position of the grate pos. 1.
B) Position the refractory stones pos. 2 in the upper part of the
furnace.
C) Check that the smoke deflectors pos. 3 are fitted correctly in
place.
Содержание PELLEXIA 80
Страница 1: ...PELLEXIA 80 INSTRUCTIONS ON INSTALLATION USE AND MAINTENANCE ...
Страница 4: ...4 This page has been intentionally left blank ...
Страница 14: ...14 This page has been intentionally left blank ...
Страница 50: ......
Страница 51: ......