Unical HP_OWER 250N Скачать руководство пользователя страница 16

 

16 

 

It is a good rule to carry out periodic checks in order to verify the proper operation of the unit. 

OPERATION 

1 month  4 month  6 month 

Charging the water circuit. 

 

 

Presence of bubbles in the water circuit. 

 

 

Check if the safety and control devices work correctly 

 

 

Check if there is oil leakage from compressor. 

 

 

Check if there is water leakage from the hydraulic circuit. 

 

 

Check the proper working of the flow switches. 

 

 

Check that the crankcase electric heaters are properly supplied and functioning. 

 

 

Clean the metallic filters of the hydraulic circuit. 

 

 

Clean the finned coil by means of compressed air or water jet. 

 

 

Check if all the terminals on the electric board as well as on the terminals of the compressor are 

properly fixed. 

 

 

Check the tightening of water connections. 

 

 

Check the tightening and the balancing of the fan blades. 

 

 

If the voltage is correct. 

 

 

Check the Correct absorption. 

 

 

Check the refrigerant charge. 

 

 

Check the operating pressure, and superheat and sub-cooling 

 

 

Check of the efficiency of circulation pump. 

 

 

Check the expansion tank. 

 

 

If the unit should be out of service for a long period, discharge water from the piping and from 

heat exchanger. This operation is necessary if, during seasonal stoppages, ambient temperature is 

expected to go down below the freezing point of the employed fluid. 

 

 

10.1

 

ENVIRONMENTAL PROTECTION 

According to the norms dealing with the use of depleting stratospheric ozone substances, it is forbidden to disperse refrigerants 

fluids in the atmosphere. They have to be collected and delivered to the seller or to proper gathering points at the end of their 

operating life. Refrigerant R410A is mentioned among controlled substances and for this reason it has to be subjected to the 

mentioned norms. 

A particular care is recommended during service operations in order to reduce as much as possible any 

refrigerant loss.

 

11

 

DISPOSAL OF THE UNIT 

Once the unit is arrived at the end of its life cycle and needs to be removed or replaced, the following operations are 

recommended: 

  the refrigerant has to be recovered by trained people and sent to proper collecting centre; 

  compressors’ lubricating oil has to be collected and sent to proper collecting centre; 

  the frame and the various components, if not serviceable any longer, have to be dismantled and divided according to their 

nature, particularly copper and aluminium, which are present in conspicuous quantity in the unit. These operations allow easy 

material recover and recycling process, thus reducing the environmental impact. 

The user is responsible of the proper disposal of this product, according to national regulations in the country of destination of the 

appliance. For more information you should contact the installation company or local competent authority. 

 

An incorrect decommissioning of the appliance may create serious environmental damage and endanger people’s 

safety. Therefore, it’s recommended that the unit shall be disposed only by authorized persons and technical training 

who have followed training courses recognized by the competent authorities. 
It is required to follow the same precautions described in the previous paragraphs. 
Pay special attention during the disposal operation of the refrigerant gas. 
The illegal disposal of the product by the end user leads to the application of the penalties in accordance with the 

law in the country where the disposal takes place. 

 

The crossed bin symbol applied on the appliance indicates that the product, at the end of its useful life, must be 

collected separately from other wastes. 

Содержание HP_OWER 250N

Страница 1: ...User s and Installer s Manual 250 350 500 N...

Страница 2: ...optional module terminal block CODE 00264034 13 7 START UP 14 7 1 POWER ON OF THE UNIT 14 8 INDICATIONS FOR THE USER 14 9 SHUTDOWNS FOR LONG PERIODS 14 10 MAINTENANCE AND PERIODICAL CONTROLS 15 10 1...

Страница 3: ...unit it refers to It has to be stored in a safe place away from the dust and moisture It has to be accessible to all users who shall consult it any time they are in doubt on how to operate the equipm...

Страница 4: ...well as any applicable local laws and authorized specifications The execution of all works must be performed by skilled and qualified personnel competent in the existing rules in different countries T...

Страница 5: ...ce s health and safety including 89 391 CEE 89 686 CEE 89 655 CEE 2009 104 CE 86 188 CEE and 77 576 CEE directives Every employer shall implement such norms and ensure that workers to respect them It...

Страница 6: ...TWA 1000 ml m for each of the two components Respiratory protection For rescue and maintenance operation in storage tanks use self contained respirator The vapors are heavier than air and can cause su...

Страница 7: ...ng the unit immediately check its integrity The unit left the factory in perfect condition any eventual damage has to be questioned to the carrier and recorded on the Delivery Note before signing it T...

Страница 8: ...rubber band between basement and unit base frame It is also possible to install anti vibration supports springs or rubbers to keep vibrations at a very low level An absolute care has to be taken to en...

Страница 9: ...ing water for the plant please refer to UNI 8065 CAUTION The INVERTER control system is able to manage minimum water contents in the plant up to a value of 75 liters for the model HP_OWER 250 of 105 l...

Страница 10: ...R 4WV CYCLE REVERSING VALVE LR LIQUID RECEIVER EEV ELECTRONIC EXPANSION VALVE FL FILTER M AXIAL FAN SE OUTDOOR AIR TEMPERATURE SENSOR P CIRCULATOR ON BOARD UNIT IN WATER INLET TEMPERATURE OUT WATER OU...

Страница 11: ...must be installed in TN S TT power supply grounding systems The electrical installation must be carried out in accordance with norms in force WARNING The supply voltage s fluctuations cannot exceed 5...

Страница 12: ...utral conductor N 6 6 2 User s terminal block L1F1 L1F1 L2F1 L2F1 L3F1 L3F1 N 1 N 2 N 1 N 2 PE 1 PE 1 L3 1 L3 2 L3 1 L3 2 HPS HPS 12AC1 12N1 12AC1 12N1 DO1 DO3 DO5 DO4 DO6 DO7 DO2 DO7N DO6N DO5N DO4N...

Страница 13: ...the unit s front panel For the configuration of the functionalities please check the control manual supplied with the unit DO1E DO3E DO5E DO4E ST5E ST6E DO2E DO1EN DO1EN DO1E DO3E DO5E DO4E ST5E ST6E...

Страница 14: ...hanges of this seasonal operating mode have to be avoided in order to prevent severe damages to compressors WARNING When you first install and start up the unit make sure that the unit is working prop...

Страница 15: ...entering the inner components of the unit be sure that the power supply is disconnected The compressor s heads and discharge pipes are usually at high temperature levels Be very careful when operating...

Страница 16: ...rolled substances and for this reason it has to be subjected to the mentioned norms A particular care is recommended during service operations in order to reduce as much as possible any refrigerant lo...

Страница 17: ...0 27 04 29 1 36 21 38 4 36 36 38 3 Power input 2 kW 6 48 6 35 9 1 8 96 12 49 12 45 EER 2 W W 3 24 3 33 2 96 3 02 2 90 2 92 SEER 5 W W 3 98 4 00 4 03 Heating Heating capacity 3 kW 24 72 27 2 24 57 27 2...

Страница 18: ...70 dB A 74 dB A 77 dB A Precautions for installation and maintenance Read precautions for installation and maintenance at specific chapters on user s and installation s manual PRODUCT FICHE HP_OWER f...

Страница 19: ...5 94 Tj bivalent temperature Pdh 16 4 kW Tj bivalent temperature COPd 2 36 Tj operation limit temperature Pdh 13 8 kW Tj operation limit temperature COPd 1 76 For air to water heat pumps Tj 15 C if T...

Страница 20: ...89 Tj bivalent temperature Pdh 20 5 kW Tj bivalent temperature COPd 2 12 Tj operation limit temperature Pdh 17 7 kW Tj operation limit temperature COPd 1 83 For air to water heat pumps Tj 15 C if TOL...

Страница 21: ...5 76 Tj bivalent temperature Pdh 31 4 kW Tj bivalent temperature COPd 2 23 Tj operation limit temperature Pdh 26 6 kW Tj operation limit temperature COPd 1 73 For air to water heat pumps Tj 15 C if TO...

Страница 22: ...W Tj 12 C COPd 3 68 Tj bivalent temperature Pdh 11 6 kW Tj bivalent temperature COPd 1 78 Tj operation limit temperature Pdh 9 8 kW Tj operation limit temperature COPd 1 56 For air to water heat pumps...

Страница 23: ...W Tj 12 C COPd 3 88 Tj bivalent temperature Pdh 20 7 kW Tj bivalent temperature COPd 1 59 Tj operation limit temperature Pdh 17 6 kW Tj operation limit temperature COPd 1 33 For air to water heat pump...

Страница 24: ...W Tj 12 C COPd 3 51 Tj bivalent temperature Pdh 23 0 kW Tj bivalent temperature COPd 1 78 Tj operation limit temperature Pdh 19 6 kW Tj operation limit temperature COPd 1 56 For air to water heat pump...

Страница 25: ...with the UNI EN ISO 9614 2 13 ELECTRIC DATA OF THE UNIT AND AUXILIARIES Power supply of the unit V Hz 400 3 50 Remote control circuit V Hz 12 1 50 Control board circuit V Hz 12 1 50 Fans power supply...

Страница 26: ...ve circulator with the possibility of choice between constant P and variable P 15 2 MODEL HP_OWER 500N Configuration with integrated circulator control via 0 10 volt analogic signal Configuration with...

Страница 27: ...SS CURVES OF THE HYDRONIC CIRCUIT We obtain the pressure head of the circulating pump from the addition of the head losses of the hydronic circuit and the available head pressure For example for the m...

Страница 28: ...rmal insulation which reduces at very low outside temperatures the heat losses of 2 compared to a standard insulation 18 2 SSL Cod 00264038 The super silenced unit with SLN accessory is provided not o...

Страница 29: ...lity study and evaluation of changes to be made according to your requests The maximum temperature that can be maintained at the outlet of the evaporator is 25 C Higher temperatures up to a maximum of...

Страница 30: ...ssure drops correction factor The water flow rate and pressure drop correction factors are to be applied directly to the values given for operation without glycol The water flow rate correction factor...

Страница 31: ...Max Packing height mm Max Packing height with AXITOP Versions SSL mm HP_OWER 250N 350N 1673 1906 1785 2030 HP_OWER 500N 1745 1910 1890 2055 Some units could be shipped with another type of packaging...

Страница 32: ...he units is indicative and useful to present the main components and can therefore vary from the purchased one The front panel is closed The front panel is open at 180 Disconnecting switch with door l...

Страница 33: ...n models there are also other components installed in an additional plate at the bottom left side of the electric box On board terminal block and user s terminal block Support boards Transformer Drive...

Страница 34: ......

Страница 35: ......

Страница 36: ...s It also reserves the right to modify its products as deemed necessary or useful without jeopardising their essential features 46033 casteldario mantova italia tel 39 0376 57001 fax 39 0376 660556 in...

Отзывы: