11
Installation info
fig.3
2.2.1 - PACKING
EVE 05
is delivered completely assembled and
packed in a strong cardboard box. Once the
boiler has been unpacked check that it is in-
tact.
750
430
330
Keep the packaging material
(cardboard box, plastic strips,
plastic bag, etc.) out of the
reach of children as it represen-
ts a choking and suffocation
hazard.
In addition to the boiler packaging contains:
-
a bag with:
-
installation, use and maintenance
handbook,
-
template for fixing the boiler to the wall,
A bag containing:
-
2 dowels with screws hook to fix the boiler
to the wall,
-
a diaphragm for flue gas outlet
UNICAL refuses all liability
for injury to persons and ani-
mals or damage to property
resulting from non-observan-
ce of the above.
2
DIRECTIONS FOR
INSTALLER
2.1 - DIRECTIONS FOR
INSTALLER
EVE 05
is a gas boiler which must be instal-
led in accordance with the latest regulations
or rules in force. For the boiler category,
which changes according to the destination
country, see page 6.
NOTE:
Observe the corresponding technical rules and
the building supervisory and statutory
regulations of the country of final use when
installing and operating the system.
Always ensure that an appropriately specialised
company is entrusted with installation, gas
supply and flue gas connection, commissioning
and power supply connection, as well as all
servicing and repair work.
Work on gas conduits and fittings must only
be carried out by a registered service provider.
The system must be cleaned and serviced once
a year. This includes an inspection of the entire
system to see if it is in full working order.
Defects and faults must be eliminated
immediately.
Please note that we can accept no liability
whatsoever for loss or injury resulting from
unauthorised adjustment or manipulation of the
system’s control or regulating devices.
2.2 - INSTALLATION
-
2 sealed room closing 2 sealing
gaskets and the fixing screws. “