![Unic URW295CUR Скачать руководство пользователя страница 130](http://html1.mh-extra.com/html/unic/urw295cur/urw295cur_workshop-manual_3702661130.webp)
MAINTENANCE AND INSPECTION OF CARRIER
In order to secure safety in crane operation and to improve working efficiency, be sure to
inspect each part of the carrier according to the table as follows:
28.1 Inspection before operation
★
Since the machine uses gasoline as fuel, check the hose for cra
ck and
connections for tightness if you have a smell of gasoline around the
engine.
If fuel leaked in the vicinity of engine and muffler which are very hot may
cause a fire.
W
ipe it off completely.
★
Be sure to stop the engine, and store the boom and the outriggers
before carrying out maintenance and inspection.
★
A fire source such as smoking cigarette in mouth is strictly prohibited.
★
Do not start maintenance and inspection immediately after the engine
has been stopped.
Carry it out after the engine and the heated parts have been cooled down.
★
Perform monthly and annual inspection according to“Voluntary
inspection table”in the warranty which is provided separately.
★
Keep the crawler crane in good condition so that it will be always
ready for normal operation.
Device
Servicing item
Device
Servicing item
Engine
Fuel leakage
Remaining fuel quantity
Engine oil quantity/Filling up
Battery electrolytic solution
level check
Unusual vibration, Noise
Loose bolt, Broken bolt
Hydraulic oil
tank
Oil leakage, Oil quantity,
Filling up
Interlock for
crane-crawl
lever
Function
Crawling lever
Slack, Travel
Wheel sprocket
Loose bolt
Rubber crawler
Crack, Damage, Tension
Frame
Bend, Crack, Deformation
Truck roller
Loose nut, Oil leakage
WARNING
CAUTION
( 28 - 1 )
Содержание URW295CUR
Страница 1: ...URW295CUR URW295CUR URW295CAR URW295CAR Courtesy of Machine Market...
Страница 2: ...Courtesy of Machine Market...
Страница 6: ...A I O C I C I R R L L F L L L y y URW 95CUR y URW 95CAR Courtesy of Machine Market...
Страница 20: ...7 O 7 5 R R ON D ON F V D OFF ON D y D ON R OFF R O 7 Courtesy of Machine Market...
Страница 23: ...Courtesy of Machine Market...
Страница 27: ...Courtesy of Machine Market...
Страница 28: ...Courtesy of Machine Market...
Страница 29: ...Courtesy of Machine Market...
Страница 30: ...E ACC ON y 5 D H F F F D H A y D H L T A D C W y C C W O C H Z H W y CC y N Courtesy of Machine Market...
Страница 35: ...Courtesy of Machine Market...
Страница 40: ...8QKEG OGUUCIG N KUV 5VQR GZVGPF TGVTCEV 5VQR TCKUG NQYGT YKPF FQYP 5VQR YKPF WR Courtesy of Machine Market...
Страница 45: ...9 5 Back pressure valve ring 731191018 Back pressure valve Gauge port Courtesy of Machine Market...
Страница 80: ...Courtesy of Machine Market...
Страница 84: ...Courtesy of Machine Market...
Страница 85: ...Courtesy of Machine Market...
Страница 101: ...22 1 Construction of slipriing 22 1 Courtesy of Machine Market...
Страница 103: ...23 2 23 2 Boom top in detail Courtesy of Machine Market...
Страница 113: ...Courtesy of Machine Market...
Страница 116: ...WIRE ROPE RETAINING MECHANISM Limit switch 750306029 25 1 Courtesy of Machine Market...
Страница 123: ...I y P R 6 P F R y y A I y N y y y F I y y C I F I y P F F F I y L L R C F Courtesy of Machine Market...
Страница 131: ...Courtesy of Machine Market...