background image

◊ 

PRÉSENTATION OF THE STELLA EPIC

The Stella di Caffè features a water boiler for each group. In addition, a 

large separate boiler provides an ample supply of steam.

Almost all parameters of the machine can be viewed and adjusted simply 

and intuitively from the touch screen.

◊ 

PRÉPARATION OF THE MACHINE

The machine is delivered in a cardboard box and is screwed onto a 

wooden pallet.

 

¾

Unpacking the machine

- Cut the strapping. 

- Open the crate and take out the box containing the accessories. 

- Unscrew the nuts securing the machine to the pallet. 

- Separate the cardboard box from the pallet. 

- Remove the machine from the pallet and place it on wooden blocks. 

- Remove the transport screws and washers.

 

¾

Preparing the site and installing the machine

- Position the machine in its final location, and level it with rubber wash

-

ers if necessary. 

- The machine must be installed on a flat surface. 

- It is necessary to leave a space of 5 cm at the back. Do not obstruct 

the air intakes provided on the top of the machine. 

- An earthed electric socket corresponding with the characteristics of 

the machine and a water supply are enough. 

- The canopies are put in place after the settings have been done. 

- The machine must not operate without its feet. 

◊ 

WATER CONNECTION

Water softener essential above 5° KH

Water supply:

- Pressure: 0 - 8 bars (0.1MPa - 0.8 MPa). 

- Union: 3/8 female gas (male union on the machine). 

- Tube: internal diameter 8 mm minimum. 

- Provide a shut-off tap. 

Work on the right side of the machine:

Unscrew the bolt (ref. NM096) at top at the cup heater.

Slide the side toward the back.

Screw the water inlet tube to the union in the machine (photo opposite).

Draining:

- Union: Ø18 mm (female on the machine). 

- Tube: internal diameter 12 mm minimum. 

The drain tube is supplied fitted on the machine. It is held by an adjust

-

able Rilsan collar. Dislodge the tube from the collar.

Then connect the other end of the drain tube to a waste water drain by 

ensuring that no adverse slope interferes with good outflow.

Drain pipe are mounted and delivered on the machine. 

Connect the other end of the drain pipe to a waste water drain while making sure that there are no reverse slopes 

to hinder the flow.

◊ 

ELECTRIC CONNECTION

CAUTION: The machine must be connected to a fixed wiring with an all-pole disconnector.

The machine is delivered with a cable consisting of 5 wires.

- Put the all-pole disconnector on “0” before any intervention.

- Make sure that the voltage, frequency and power values marked on the machine data plate are in conformity 

with the electric network mains

- Make sure that the machine connection matches the available voltage supply (see wiring diagrams hereunder). 

If necessary, modify by moving bridges on the terminal block (left side of the machine)

CAUTION: for connection to 230V with a 5 cable core, wires situated at the end of the cable must be correctly 

coupled.

- 230V single phase: blue and black wires together, brown and grey wires together. Be aware with the amperage 

(32A).

- 230V three phase: brown and grey wires to there is no neutral so the blue wire must be connected to 

a phase.

 

¾

ADAPTATION OF TRANSFORMER TO ACCOMMODATE INCOMMING VOLTAGE

The machine is equipped with a multi-voltage transformer to ensure correct supply voltage to the electronics.

The machine is set in the factory according to the destination country.

IN ALL CASES THE GREEN/YELLOW WIRE MUST BE GROUNDED

If it is necessary to change the factory setting, only the jumpers should be repositioned: no wiring should be 

moved.

◊ 

STARTING-UP

When the power is switched on the machine performs an initialisation cycle that checks all the components; the 

starting up time is approximately 45sec.

 

¾

Filling the boilers

As soon as the power is switched on the boilers fill automatically.

Remember to turn on the water stop valve.

 

♦ Steam boiler

A safety function is provided in case the boiler is not filled in within 3 minutes: the filling solenoid valve and the 

pump switch off.

In all cases:

Check the water supply to the machine

Switch the machine off and on again: switch the main isolation switch to 0 and then back to 1

Filling starts again

 

♦ Group boilers

A small amount of water should flow out of each group.

If not, the light bar above the faulty group flashes:

Check the water supply to the machine

Switch the machine off and on again: switch the main isolation switch to 0 and then back to 1

Filling starts again

Examples :

Safety advice

This device is intended to be used only for its specific 

use.

The  manufacturer  disclaims  any  liability  for  damage 

caused by abnormal use or abuse.

Children  8  years  of  age  or  older  and  persons  with 

reduced physical, mental or sensory abilities, or lack of 

experience and skill may use this device, if supervised by 

a qualified person, or they have received the instructions 

for use and security necessary to understand the risks 

involved.

Supervise children to make sure they do not play with 

the  appliance  and  they  can’t  make  the  cleaning  & 

maintenance of the machine.

Do  not  leave  the  packaging  elements  within  reach  of 

children.  These  elements  are  potentially  a  source  of 

danger.

The installation must be done by a qualified technician 

and following local and national regulations. He is the 

only one to be authorized to access the internal parts of 

the device for maintenance and repair.

Use  only  the  technical  and  spare  parts  manuals 

for  proper  functioning  of  the  machine,  and  avoid 

compromising safety.

Access to the service area is limited to persons with the 

necessary knowledge of safety and hygiene as well as 

practical experience of the device.

Leave enough free space around the machine to facilitate 

its use and to preform any maintenance operations.

The device 

must not be

:

- exposed to the elements of the external environment 

or placed in damp places, 

- exposed to a water jet or splashing. 

-  installed  in  areas  where  the  jets  or  high  pressure 

cleaners are used. 

The device 

must be

:

- placed on a stable, level and horizontal surface 

- used at an ambient temperature of 5°C to 35°C (41°F 

- 95°F), (if it is stored at an ambient temperature below 

5°C  (41°F)  the  water  circuit  (boiler-piping)  must  be 

drained.) 

-  if  the  device  freezes,  wait  24  hours  at  a  minimum 

temperature of 10°C (50°F) before restarting the device.

Before connecting the power and water supplies, check 

that the electrical and water network are in accordance 

with the technical information plate of the device.

The power supply must be provided with the following 

safety features: power switch which completely isolates 

the machine from the mains (gap between contacts of 

at least 3 mm), efficient earthing and an effective circuit 

breaker for protection against earthing leaks; section of 

the conductors appropriate for a power capacity.

Before  connecting  or  disconnecting  the  power  cable, 

switch  the  main  switch  onto  position  0.  If  the  power 

supply  cable  is  damaged,  it  must  be  replaced  by  the 

manufacturer,  by  its  after-sales  service  technician  or 

similarly qualified persons, to avoid any danger.

For  electrical  safety,  make  sure  that  the  device  is 

properly earthed.

The  manufacturer  disclaims  any  liability  for  damage 

caused by improper earthing.

The device must be connected to a water network with 

a  pressure  of  1  to  8  bar  (0.1  to  0.8  MPa)  and  a  tap 

readily  accessible  must  be  fitted  in  front  of  the  water 

supply tube. The device is to be installed with adequate 

backflow  protection  to  comply  with  applicable  federal 

state and local codes.

In case of emergency (fire, surge, abnormal noise, etc. 

the first thing to do is to cut off the current and close the 

water tap.

Be careful not to obstruct the air inlets of the machine 

with towels or other objects.

Beware of hot surfaces such as cup heaters, the unit 

heads and the hot water and steam outputs.

Never install containers filled with liquid on the top of 

the machine.

Beware of jets of hot water or steam.

The  machine  should  be  descaled  only  by  a  qualified 

technician.

Отзывы: