7
6. STARTING-UP
Filling the boilers
Turn on the shutoff valve.
Plug in the machine.
Set the charge switch to Position 1. (Do not set the charge switch to
Position 2 until the boiler has been filled).
ON/OFF SWITCH
Steam boiler
- As soon as the machine is turned on, the filling takes place automatically.
A safety is programmed, if the filling does not occur before 3 minutes. In this special case, the
electrovalve and the pump are cut off.
The light blinks.
- Check the hydraulic connection of the machine.
- Switch off and switch on the machine by setting the charge switch to Position 0 then to position 1.
- The filling starts again and lasts 3 minutes.
Internal boilers
- With the filter holder in place, press the continuous/stop key of each unit.
As soon as the water flows correctly from the spout (with no air), press the same key again to stop
the water.
Heating
When the boilers have been filled, set the charge switch to Position
2
.
When the operating temperature of the machine is reached, the pressure-gauge must indicate a
pressure of 0.9 to 1 bar (red scale).
It is better to keep the machine switched on permanently and the filter-holders inserted in
machine even when you are not making coffees.
Содержание Mira
Страница 1: ...1 RB9002 MARCH 2014 EDITION ...