
Accuracy Specifications
A. AC Voltage
B. DC Voltage
C. Continuity, Resistance &
Conductance Test
D. Capacitance
E. Diodes Test
F. DC Current
G. AC Current
H. Frequency & Duty Cycle
Maintenance
A. General Service
B. Testing the Fuses
C. Replacing the Battery
D. Replacing the Fuses
RS232C Serial Port
A. RS232C Port Cable
B. Setting of RS232C Serial Ports
C. System Requirements for Installing the
UT70D Interface Program
37
37
37
38
38
38
39
39
40
42
42
43
44
45
46
46
46
47
Содержание UT70D
Страница 8: ...The Meter Structure see figure 1 ...
Страница 12: ...Display Symbols 1 see figure 2 No Symbol Meaning 8 6 4 3 ...
Страница 13: ......
Страница 34: ...34 Turning on the Display Backlight ...
Страница 35: ...35 ...
Страница 41: ...41 5 Duty Cycle 1 99 600Vp ...
Страница 43: ...43 MAINTENANCE 2 ...
Страница 44: ...44 MAINTENANCE 3 ...
Страница 46: ...46 B Setting of RS232C Serial Ports see figure 15 ...