B. Examination of cable and cable drum
1. Examination of cable
Cable should be examined once a month, check if plated bands are broken. (Only on steel
cable).
Hoisting drum should be replaced in case of any broken plated bands.
Damages of the cables can occur when the cable is coiled beside the drum. Frequent causes
here for is an insufficient preload of the cable before putting into operation.
2. Replacement of cable drum
Remove nuts from shearing screw BTC484336 and beat through shearing screw through the
shaft.
•
Pull down driver BTP584354 from the shaft.
•
Cut cable therewith stop for Tracker BTC584357 can be deduct from the cable.
•
Deduct cable drum from the arbor and replace it by a new cable drum BB0284412.
Содержание Tracker T-400
Страница 1: ...T 400 Portable Irrigation Machine Maintenance Repair Manual...
Страница 2: ......
Страница 3: ......