All rights reserved Undercover
®
2016
Takedown:
1) Sparate dome-room from base-
camp.
2) Remove footplate and tie-down
stakes.
2) Lower all four telescopic legs.
3) Release all four red corner-sliders
4) From middle position lift frame
and walk inward until closed.
Insert the fabric pocket under the leg
footplate, extend all four legs to the
second and highest lock position.
5
STEP
4
Step on footplate, pull leg upward
until it locks in the first extended position.
STEP
6
Extend the tie-down ropes aprox 5'
from each corner on the roof-line and
properly stake.
STEP
Lock each corner.
3
STEP
2
Lift frame at middle position and
step backwards until open fully.
STEP
Expand frame to arms length.
1
STEP
Base-Camp Setup:
Place the shelter in the center of the
area to be covered.
It is important that you read this carefully before attempting the Setup!
Operating Instructions
TM