background image

 

                                                    

 

17 

 

Screen 4: Cycle Count 

The  second  screen  shows  the  number  of  cycles  which  the 

Q-Series

 

ultrasonic bath has run since new. 

 

The  cycle  count  shows  all  cycles  which  the  bath  has  begun  and  includes 
those  cycles  which  are  not  completed;  i.e.  those  cycles  aborted  by  the 
operator or because the fluid level was low. 

 

Screen 5: Low power 

In  its  factory  preset  mode,  the 

Q-Series

  ultrasonic  bath  will  maintain  the 

set fluid temperature. This means that it is consuming power when sitting 
idle (ie. when the sonics are not running). 

The 

Q-Series

 can be set to save power when not in use. 

 

 

Setting  Low  Power  to  ON  means  that  after  five  minutes  of  inactivity,  the  

Q-Series

 ultrasonic bath will enter its SLEEP mode – the screen illumination 

will power down, and the internal water heater will not operate. 

The 

Q-Series

  ultrasonic  bath  uses  less  than  10Watts  of  power  whilst  in 

SLEEP mode. 

By setting Low Power to OFF, the 

Q-Series

 screen will maintain the set fluid 

temperature;  i.e.  when  the  fluid  temperature  falls  below  the  specified 
setting,  the  heaters  will  automatically  switch  on,  meaning  the  bath  is 
immediately ready for use when required. 

When the desired option is selected, use the MENU key to move to the next 
screen. 

Содержание Q Series

Страница 1: ......

Страница 2: ...Ultrasonic cleaning detergents 22 Specifications 23 Technical information 25 Troubleshooting 26 Cycle abort modes 27 Maintenance 28 Service 28 Returning equipment to Ultrawave 29 Warranty 30 Temperatu...

Страница 3: ...become hot Never use toxic flammable acidic caustic or corrosive solutions in the bath Do not move the bath when it contains water Before cleaning drain the bath Clean by wiping with a clean non abras...

Страница 4: ...2m length of drain hose 1 x hose tail 1 x Ultraclean detergent sample How to install Screw the hose connector into the drain valve at the rear of the unit Locate the unit close to a drain or sink Con...

Страница 5: ...the cleaning cycle At the end of the cycle remove the basket from the bath and rinse the items under clean running water The lid can be inverted and the basket placed on top to catch excess fluid as...

Страница 6: ...at the rear of the unit The switch will then illuminate The Q Series is operated through a menu driven control system The different keys perform the following functions KEY 1 Enter Starts and ends the...

Страница 7: ...will display alternately When the water temperature is at or above the temperature set the message Temp OK will display The actual temperature in the bath will vary and will be different to the value...

Страница 8: ...page 24 You will need to degas the liquid to ensure good cleaning efficacy By choosing YES your Q Series ultrasonic bath will run an automatic de gas cycle The following screen will display When you a...

Страница 9: ...arameters can be altered To access the options menu and scroll through the various changeable parameters press the MENU key when the following screen is displayed To scroll through the menu press the...

Страница 10: ...en the bath is full of fluid Please note that during normal operation ultrasonic energy will heat the cleaning fluid by up to 15 C per hour Your Q Series ultrasonic bath cannot cool the cleaning fluid...

Страница 11: ...art the next cycle Screen 3 Setting the power level Your Q Series ultrasonic bath allows the power level of the ultrasonic activity to be adjusted This allows the cleaning cycle to be accurately tailo...

Страница 12: ...ed option See page 26 for the importance of degassing If you turn the degas function ON your Q Series ultrasonic bath will run a degas cycle every time the cycle start key is depressed Once the correc...

Страница 13: ...pplications the operator can choose between Frequency LEAP and traditional ultrasonic activity Use the ON and OFF keys to select the required option Once the correct option is selected press the MENU...

Страница 14: ...g cycle When the Q Series is in operation the following screen will display This screen is only an example The actual time and temperature shown will be the time as set by the operator and the actual...

Страница 15: ...3 and 4 together The following screen will then appear In order to scroll through the settings available in the Advanced Menu press the MENU key You may exit the Advanced Menu at any time by pressing...

Страница 16: ...the bath has been in use for a total of 2 days 5 hours and 27 minutes Screen 3 Clock The Q Series is fitted with a real time clock This is factory set to the correct time and date but can be changed...

Страница 17: ...are not running The Q Series can be set to save power when not in use Setting Low Power to ON means that after five minutes of inactivity the Q Series ultrasonic bath will enter its SLEEP mode the scr...

Страница 18: ...deionised DI water is used There is a considerable risk of causing damage to the tank if a minimum amount of water is not always retained in the bath Use with extreme caution Use the ON and OFF keys...

Страница 19: ...sonic generator will turn on irrespective of any other programmed settings You will then be sure that the Q Series ultrasonic bath is operating in the mode required for accurate portable appliance tes...

Страница 20: ...der which allows easy transfer of the cycle information from the machine to a PC The memory card can be connected to a PC using this memory to USB card reader to give a permanent electronic record of...

Страница 21: ...PC and insert the memory card into the relevant port on the card reader There is a file on the memory card which is already set up to provide a template for recording the data Ultrawave xls Open this...

Страница 22: ...nt for aluminium and other soft metals Ultraclean CBX A heavy oil and carbon remover for non ferrous metals Ultraclean CS A carbon and heavy contaminant remover not for use on aluminium and other soft...

Страница 23: ...sions mm QS3 2 5 2 75 285x185x265 240x140x100 220x125x40 QS4 3 75 4 285x185x265 240x140x150 215x120x90 QS5 4 5 5 345x200x265 300x150x150 273x125x90 QS10 9 5 10 5 550x180x265 500x140x150 460x110x90 QS1...

Страница 24: ...wer W Mains voltage Vac QS3 32 to 38 0 80 200 50 150 220 240 QS4 32 to 38 0 80 200 50 150 220 240 QS5 32 to 38 0 80 350 100 150 220 240 QS10 32 to 38 0 80 450 200 250 220 240 QS12 32 to 38 0 80 500 20...

Страница 25: ...ll run the cleaning cycle The effect of heat Heating the liquid in the bath will aid the cleaning process Normally a temperature of between 30 to 60 C is sufficient to accelerate the process You will...

Страница 26: ...htly more detergent may be required If pure water eg De I or RO is being used the level sensor can be disabled in the advanced menu see page 19 The screen displays Sonics Low The Q Series is fitted wi...

Страница 27: ...evel during operation the cleaning cycle will stop and the following screen will be displayed The Q Series will not operate again until the tank is filled to the correct level If the power to the ultr...

Страница 28: ...t as an abrasive causing wear on the metal surface In extreme cases the bath will develop holes and start to leak Portable Appliance Testing should be conducted with water in the bath Service Ultrawav...

Страница 29: ...er the phone we may suggest returning your product to the distributor where purchased or directly to Ultrawave Where appropriate we operate a Return To Base RTB warranty and repairs policy Decontamina...

Страница 30: ...bonding material are exposed to liquid or cleaning chemicals the warranty will be invalidated The warranty does not apply to normal wear and tear damage caused by misuse non observance of maintenance...

Страница 31: ...2000 Ergonomics of the thermal environment Temperatures of touchable hot surfaces Guidance for establishing surface temperature limit values in production standards with the aid of EN 563 1994 Safety...

Страница 32: ...ing is now 80 decibels There is also an exposure limit value of 87 decibels taking account of any reduction in exposure provided by hearing protection above which workers must not be exposed To help y...

Страница 33: ...ineer conducting the service There are no user serviceable parts inside All service and repair should be referred to qualified Ultrawave engineers only Date Cycle count Engineer Details Next service d...

Страница 34: ...Details Next service due Date Cycle count Engineer Details Next service due Date Cycle count Engineer Details Next service due Date Cycle count Engineer Details Next service due Date Cycle count Engin...

Страница 35: ...Date Cycle count Engineer Details Next service due Date Cycle count Engineer Details Next service due Date Cycle count Engineer Details Next service due Date Cycle count Engineer Details Next service...

Страница 36: ...________________________________ _______________________________________________ _______________________________________________ _______________________________________________ _______________________...

Страница 37: ...________________________________ _______________________________________________ _______________________________________________ _______________________________________________ _______________________...

Страница 38: ......

Страница 39: ......

Отзывы: