STEP 1 - DIG FOOTER HOLES

155”

(3937mm)

94”(2388mm)

181” (4597mm)

IMPORTANT: 

Never install play equipment over hard, 

unresilient surfaces such as asphalt, concrete or 

compacted earth.  It is the owner’s responsibility to ensure 

the “minimum area required” contains an appropriate 

amount of resilient material to cushion accidental falls.

Placement for 

24” Diameter x 20” Deep Holes

for Single Bay Swings ( PBP-8-1S[C])

Concrete Required :

Approximately .75 Cubic Yards (.6 Cubic Meters)

GROUND

Swing Leg

SURFACING

CONCRETE

CONCRETE

Place brick or equivalent in the bottom of all footings

to prevent Legs from sinking into the ground.

Brick or equivalent

24”(610mm) x 20”(508mm) Deep

Содержание uPLAY TODAY PBP-8-1S

Страница 1: ...UPLAYTODAY 800 458 5872 ultraplay com MODEL PBP 8 1S Set of 2 Strap Seats MODEL PBP 8 1C Set of 2 Infant Seats ASSEMBLY INSTRUCTIONS 2 Infant Seats 55 451RB 02 10 15...

Страница 2: ...eling and touch up if necessary Check all Tot Seats for cracks breakage or wear and immediately put equipment out of service until any faulty parts found are repaired or replaced Check S hooks at both...

Страница 3: ...3 UPLAYTODAY 800 458 5872 ultraplay com Tape Measure Utility Knife Level Wrench 3 4 Socket Wrench Allen Wrench 3 4 1 4 TOOLS REQUIRED...

Страница 4: ...8 5872 ultraplay com 4 HARDWARE REFERENCE Actual Size 7 16 x 2 Carriage Bolt 33 06 0094 7 16 Lock Nut 33 01 0017 3 8 Barrel Nut 33 01 0013 1 2 x 3 4 Long Allen Head Set Screw 33 05 0009 3 8 x 2 1 2 He...

Страница 5: ...ipment over hard unresilient surfaces such as asphalt concrete or compacted earth It is the owner s responsibility to ensure the minimum area required contains an appropriate amount of resilient mater...

Страница 6: ...2 ultraplay com 6 COMPONENTS A B C C A D E F Item Description Quantity A End Connector 2 B 8 Top Rail 1 C Swing Hangers 4 D Swing Legs Swing Seat w Chain Package Infant Seat w Chain Package optional 4...

Страница 7: ...o ensure the minimum area required contains an appropriate amount of resilient material to cushion accidental falls Placement for 24 Diameter x 20 Deep Holes for Single Bay Swings PBP 8 1S C Concrete...

Страница 8: ...olts C and secure with 2 Lock Nuts D and tighten 3 Using diagram below as a guide install remaining swing hangers NOTE Swing Hanger B placement is measured from the center of each Swing Hanger B Parts...

Страница 9: ...ector A 2 Align holes in Top Rail and Yoke Connector A and insert Hex Bolt B 3 Secure with Barrel Nut C 4 Repeat for other side Parts List Letter Description Quantity Part Number A Yoke Connector TOP...

Страница 10: ...et Screw B 3 Repeat for remaining 3 Legs 4 Stand Swing upright and place into footers holes ASSEMBLY IS COMPLETE Make sure swings are level and pour concrete into footers Parts List Letter Description...

Страница 11: ...IEW 14 356mm 12 305mm TO PROTECTIVE SURFACING Strap Seat Only 15 3 4 400mm DIMENSION FROM UNDERSIDE OF SEAT UNDER LOADED CONDITION BASED ON WEIGHT OF 165lb 75kg DIN ASTM STANDARD CANADIAN CPSC N A MIN...

Отзывы: