Issued/Revised:
32
DC-SPRING
2
1
3
4
2
5
1
CM
0
INCH
0
10
9
6
11
14
8
15
7
12
13
4
3
6
5
800.458.5872
www.ultraplay.com
3/31/2020
STEP 3
IMPORTANT:
ORIENTATION OF DRILLED
HOLES IN DECK IS CRITICAL
DECK M (02-08-0196)
LOWER POST, 22 11/16" LG.
(02-08-0152)
1. Slide Deck M onto Lower Posts.
IMPORTANT:
Orientation of drilled holes in deck is critical.
Содержание DC-SPRING DC-017
Страница 1: ...Issued Revised DC SPRING 800 458 5872 www ultraplay com 1 3 31 2020 MODEL DC 017...
Страница 2: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 15: ...Issued Revised TOOLS REQUIRED 800 458 5872 www ultraplay com 14 3 31 2020...
Страница 21: ...Issued Revised ELEVATION VIEW 800 458 5872 www ultraplay com 20 3 31 2020 5 4 3 4 164 64 cm 9 11 1 2 303 65 cm...