background image

Issued/Revised: 

15 

HARDWARE REFERNECE

2

1

3

4

2

5

1

CM

0

INCH

0

10

9

6

11

14

8

15

7

12

13

4

3

6

5

04/15/13

800.458.5872

www.ultraplay.com

M8 B.H.C.S. Bolts

13mm

1/2"

(33-11-0101)

20mm

3/4"

(33-11-0102)

25mm

1"

(33-11-0103)

30mm

1-3/16"

(33-11-0104)

35mm

1-3/8"

(33-11-0105)

40mm

1-9/16"

(33-11-0106)

45mm

1-3/4"

(33-11-0109)

50mm

2"

(33-11-0114)

70mm

2-3/4"

(33-11-0107)

80mm

3-1/8"

(33-11-0011)

70mm

2-3/4"

(33-11-0008)

60mm

2-3/8"

(33-11-0007)

50mm

2"

(33-11-0010)

40mm

1-9/16"

(33-11-0006)

35mm

1-3/8"

(33-11-0005)

30mm

1-3/16"

(33-11-0004)

25mm

1"

(33-11-0003)

20mm

3/4"

(33-11-0002)

13mm

1/2"

(33-11-0001)

M10 B.H.C.S. Bolts

M5 x 76mm (3") Self-tapping Screw

(33-11-0600)

M8 Lock Washer 

(33-11-0301)

M8 Flat Washer 

(33-11-0300)

M8 Lock Nut 

(33-11-0500)

M8 Barrel Nut 

(33-11-0501)

18" Ground Spike (Not to Scale)

(02-08-0125)

M10 Lock Washer 

(33-11-0201)

M10 Flat Washer 

(33-11-0200)

M10 Lock Nut 

(33-11-0400)

M10 T-Nut 

(33-11-0402)

100mm

4"

(33-11-0108)

Содержание DC-Seedling

Страница 1: ...Issued Revised 04 15 13 DC SEEDLING 800 458 5872 www ultraplay com 1 MODEL DC SEED...

Страница 2: ......

Страница 3: ...regarding the general placement installation and safety practices common to commercial play equipment Please read this information carefully and use your best judgment as to how these guidelines appl...

Страница 4: ...So if you have an existing structure with a slide exit oriented toward your new one add a minimum safety zone to that of the existing slide to determine how far away you need to be Never install play...

Страница 5: ...which could strangle a child All protruding nuts and bolts should be eliminated sharp edges on pipes should be capped or removed Check for bent broken or severely worn pipe and replace Examine play s...

Страница 6: ...deterioration in the metal or plastic materials maintaining the proper depth of surfacing material and cleaning up debris The following are some regular maintenance areas of note Check for and repair...

Страница 7: ...not be easily swayed connections should be solid and adequately secured Check all posts in ground for corrosion below grade When flexible components are anchored in the ground check and make sure anch...

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ...t to normal usage and installation for a period of 10 years from the date of shipment to the original customer FIVE YEAR LIMITED WARRANTY ON ROTOMOLDED AND BLOWMOLDED PLASTIC COMPONENTS UltraPlay prov...

Страница 12: ...efective equipment and the original purchase invoice or invoice number to Discovery Centers Customer Service 1675 Locust Street Red Bud IL 62278 Or Contact a Customer Service Representative at 1 800 4...

Страница 13: ...c According to ASTM guidelines Unacceptable materials for use zones of play structures with fall heights of 18 in or less shall include all hard or abrasive materials such as asphalt concrete terrazzo...

Страница 14: ...of power lines or electrical equipment Do not install play equipment near any bodies of water If adjacent to a street with traffic ensure adequate fencing acts as a barrier to children running into d...

Страница 15: ...Issued Revised 04 15 13 TOOLS REQUIRED 800 458 5872 www ultraplay com 14...

Страница 16: ...1 0107 80mm 3 1 8 33 11 0011 70mm 2 3 4 33 11 0008 60mm 2 3 8 33 11 0007 50mm 2 33 11 0010 40mm 1 9 16 33 11 0006 35mm 1 3 8 33 11 0005 30mm 1 3 16 33 11 0004 25mm 1 33 11 0003 20mm 3 4 33 11 0002 13m...

Страница 17: ...e positioned to eliminate conflicting traffic patterns As a general rule allow at least 3 of freespace around the entire structure IMPORTANT Never install play equipment over hard unresilient surfaces...

Страница 18: ...installation 1 Review Use Zone Mark the placement of one Deck Post Any of the 6 may be used NOTE Survey flags may be used to mark the placement of each hole 2 Measure from first Deck Post to mark the...

Страница 19: ...706 16 CONCRETE ANCHOR 8 33 11 0402 12 M10 T NUT 9 2 1 2 RUBBER TILES TYP 4 MINIMUM w 3000 PSI TYP UPRIGHT POST GRAVEL CONCRETE 2 8 5 9 009 011 GRAVEL CONCRETE PLATFORM MOUNTING BRACKET 012 011 1 8 CO...

Страница 20: ...24 to 44 5 After unit is assembled using Footbuck Ass ys and Footer Plates as template mark hole position on concrete Remove Footbuck Ass y and Footer Plates and drill 3 8 Dia x 2 deep holes into con...

Страница 21: ...BOLT 6 33 11 0400 2 M10 LOCK NUT 7 33 11 0402 12 M10 T NUT 8 IMPORTANT Never install paly equipment over hard unresilient surfaces such as asphalt concrete or compacted earth It is the owner s respons...

Страница 22: ...k Ass ys and Platform Onground Bracket in position secure each Footbuck Ass y and Platform Onground Bracket to the ground using Ground Spikes NOTE A 4lb hammer may be required to drive spikes into the...

Страница 23: ...rfaces such as asphalt concrete or compacted earth It is the owner s responsibility to ensure the minimum area required contains an appropriate amount of resilient material to cushion accidental falls...

Страница 24: ...10 Lock Nut See Detail 014 3 Attach Slide Mounting Bracket to Footbuck using M10 x 35mm B H C S and M10 Lock Nut See Detail 017 4 Continue assembling unit before concreting in Refer to pages 24 to 44...

Страница 25: ...HOLD BRACKET 02 08 0141 2 UPRIGHT POST 51 7 8 LG 02 08 0143 2 HANDHOLD EVEN 02 08 0145 1 SEEDLING DECK A w 4 INSERTS 02 08 0146 1 SEEDLING DECK B w 6 INSERTS 02 08 0147 1 WINDOW PANEL YELLOW 02 08 014...

Страница 26: ...Hazards For Young Children Store Unused Parts Appropriately Until Assembly Is Completed Once Assembly Is Completed Remove Any Unused Parts From The Play Environment And Dispose Save Them In A Secure L...

Страница 27: ...2 SEEDLING DECK A w 4 INSERTS 02 08 0145 021 HANDHOLD EVEN 02 08 0143 022 FOOTER COVER 02 08 0009 SLIDE HOOD w 5 INSERTS 02 08 0151 019 SEEDLING DECK B w 6 INSERTS 02 08 0146 24 WAVY SLIDE 02 08 0138...

Страница 28: ...L 02 08 0026 24 WAVY SLIDE 02 08 0138 SLIDE HOOD w 5 INSERTS 02 08 0151 SHAPES PANEL 02 08 0014 HANDHOLD EVEN 02 08 0143 CLOCK PANEL 02 08 0011 SEEDLING DECK A w 4 INSERTS 02 08 0145 SEEDLING DECK B w...

Страница 29: ...installed 2 Place Footbucks and Upright Posts in correct location according to the top view IMPORTANT Depending on mounting options surface mount in ground or on ground footing plates must be installe...

Страница 30: ...0050 LOWER POST COVERS 15 38 02 08 0028 UPRIGHT POST 51 7 8 LG 02 08 0141 LOWER POST 22 11 16 LG 02 08 0152 1 Attach Platform Mounting Brackets to Platforms using M10 x 25mm B H C S M12 Lockwasher an...

Страница 31: ...800 458 5872 www ultraplay com 1 Slide Seedling Deck A onto Upright Posts and Lower Posts IMPORTANT Orientation of drilled holes in deck is critical SEEDLING DECK A w 4 INSERTS 02 08 0145 UPRIGHT POS...

Страница 32: ...14 8 15 7 12 13 4 3 6 5 04 15 13 800 458 5872 www ultraplay com SEEDLING DECK B w 6 INSERTS 02 08 0146 LOWER POST 22 11 16 LG 02 08 0152 1 Slide Seedling Deck B onto Lower Posts IMPORTANT Orientation...

Страница 33: ...12 13 4 3 6 5 04 15 13 800 458 5872 www ultraplay com HANDHOLD BRACKET 02 08 0140 SEEDLING DECK A w 4 INSERTS 02 08 0145 UPRIGHT POST 51 7 8 LG 02 08 0141 1 Slide Handhold Brackets over Upright Posts...

Страница 34: ...com 1 Slide Shapes Panel and Handhold Even on to Upright Posts Making sure that the pipe on the Handhold Brackets is inserted into the bottom holes of the Handholds correctly IMPORTANT Panels and Hand...

Страница 35: ...king sure that the pipe on the Handhold Brackets is inserted into the bottom holes of the Handholds correctly IMPORTANT Panels and Handholds must slide over post simultaneously Warning label needs to...

Страница 36: ...Washer and M8 Lock Nut From underside of Bongo attach the Bongo Support Bracket using M8 x 25mm B H C S M10 Lock Washer M8 Flat Washer and M8 Lock Nut See Detail 003 002 PANEL M10 FLATWASHER 33 11 02...

Страница 37: ...Nut See Detail 004 6 Drill 1 4 hole through Mounting Bracket and Bongo Support Bracket to install Rivet See Detail 039 004 PANEL BONGO SUPPORT BRACKET DECK M8 x 25mm 1 BHCS BOLT 33 11 0103 M8 BARREL...

Страница 38: ...SEEDLING STEP 9 2 1 3 4 2 5 1 CM 0 INCH 0 10 9 6 11 14 8 15 7 12 13 4 3 6 5 04 15 13 800 458 5872 www ultraplay com 1 Slide Window Panel and Slide Hood into place WINDOW PANEL 02 08 0147 SLIDE HOOD w...

Страница 39: ...ng Yellow Plastic Cap M8 Lock Nut M8 Flat Washer Rainwheel Bushing and Plastic Spacer See Detail 006 NOTE Bushing may already be installed in RainWheel 005 DECK M10 x 25mm 1 BHCS BOLT 33 11 0003 M12 L...

Страница 40: ...Issued Revised 39 DC SEEDLING STEP 11 2 1 3 4 2 5 1 CM 0 INCH 0 10 9 6 11 14 8 15 7 12 13 4 3 6 5 04 15 13 800 458 5872 www ultraplay com 1 Slide Gear Panel into place GEAR PANEL 02 08 0046...

Страница 41: ...www ultraplay com 1 Slide Upper Post through the Panels and attach to Lower Post 2 Use T Tool turn clockwise to tighten all Upper Post to Lower Post See Figure 1 UPPER POST 36 5 8 LG 02 08 0153 UPPER...

Страница 42: ...x 25mm B H C S M12 Lock Washer and M10 Flat Wahser See Detail 018 2 Attach Slide to Slide Hood using M8 x 50mm B H C S M10 Lock Washer and M8 Flat Washer See Detail 019 018 SLIDE MOUNTING BRACKET M10...

Страница 43: ...18 SLIDE MOUNTING BRACKET 02 08 0150 UNDERNEATH 019 24 WAVY SLIDE 02 08 0138 UNDERNEATH 3 Attach Slide to Deck using M10 x 60mm B H C S M12 Lock Washer and M10 Flat Washer See Detail 020 020 UNDERNEAT...

Страница 44: ...olt See Detail 021 Orientation of 90 Degree Connector is critical Refer to Detail A 3 Attach Curved Leaf Connector to Upper Post Cover and Slide Hood using M10 x 25mm B H C S Bolt See Detail 021 Orien...

Страница 45: ...INCH 0 10 9 6 11 14 8 15 7 12 13 4 3 6 5 04 15 13 800 458 5872 www ultraplay com 1 Attach Post Caps to Upright Posts using M10 x 50mm B H C S See Detail 007 PANEL 007 M10 x 50mm 2 BHCS BOLT 33 11 0010...

Страница 46: ...wer Post Covers using M10 x 40mm B H C S M10 Lock Washer M8 Flat Washer and M8 Barrel Nut See Detail 022 2 Refer back to your Footing Detail options on pages 18 to 23 to finish assembly FOOTER COVER 0...

Отзывы: