background image

 
PREVENTIVE MAINTENANCE 
 

Minimal maintenance is required on a 14" (356 mm) electric fryer because of its design and materials used in the manufacturing 
process. However some preventive maintenance and inspection must be performed periodically to prevent breakdowns which 
could curtail food sales. Any preventive maintenance or inspection should be accomplished with 

CAUTION

 while the fryer is 

in operation since 

HOT

 liquid shortening could cause severe burns. If service or repair is required, all electrical power 

MUST 

BE TURNED OFF PRIOR TO 

performing that service or repair. 

 
PREVENTIVE MAINTENANCE SCHEDULE 
 
 DAILY 

 

 ITEM 

   INSPECT 

FOR 

 
 

Grease Filters 

 

 

Clean grease filters in the exhaust vet hood every evening and  

     allow 

them 

to 

dry 

overnight 

 
 WEEKLY 
 
 ITEM 

   INSPECT 

FOR 

 
 

Drain Valve Handle 

 

Determine the Drain Valve Handle is securely attached to the  

 

 

 

 

 

drain valve and that the valve and be easily opened and closed 

 
 

Temperature Sensing Probes   

During boil-out of the fryer, inspect the temperature and hi-limit  

     sensing 

probes 

for 

any 

visual 

damage 

 

 

18 

PN 30A255 June 2014 Rev A 

CAUTION:  
TURN OFF FRYER POWER BEFORE LIFTING HEATING ELEMENTS OUT OF WATER 
OR SHORTENING 

Содержание F-E21-14

Страница 1: ...or main tenance can cause property damage injury or death Read the installation operating and maintenance instructions thor oughly before installing or servicing this equipment PN 30A255 June 2014 Re...

Страница 2: ...s are identified as follows NOTE CAUTION To assure producing a quality product while prolonging the life expectancy of the fryer ensure that the boil out and cleaning instructions are strictly followe...

Страница 3: ...ANCE AND TROUBLESHOOTING Preventive Maintenance 18 Troubleshooting 19 Troubleshooting Chart 19 Cleaning General 21 Daily 21 Weekly 21 FRYER OPERATION General 23 24 Ultrastat 25 Cooking Computer 25 Sho...

Страница 4: ...GENERAL INFORMATION PN 30A255 June 2014 Rev A 4...

Страница 5: ...PN 30A255 June 2014 Rev A 5...

Страница 6: ...ld never be operated with wet hands or while standing in water To do so can result in serious electrical shock or death Fire in liquid shortening should always be a constant concern of team members op...

Страница 7: ...at 25 Cooking Computer and the Red Heating Indicator Lamp these controls are mounted on the Controller Door The Temperature P robe and Hi Limit Switch these controls are located inside the vat The Dra...

Страница 8: ...ns MODEL 14 356 mm ED14 ELECTRIC FRYER 8 PN 30A255 June 2014 Rev A Temperature Probe Hi Limit Switch Ultrastat 25 Cooking Computer Power On Off Switch Red Hi Limit Indicator Lamp Electrical Box Assy R...

Страница 9: ...TURES 1 Hi Limit Thermostat Switch with Auto Reset 2 Red Hi Limit Indicator Lamp to indicate hi limit has been exceeded 3 Ultrastat 25 Controller will power off when hi limit has been exceeded 9 PN 30...

Страница 10: ...PRE INSTALLATION PN 30A255 June 2014 Rev A 10...

Страница 11: ...0 latest edition In Canada electrical installation must be in accordance with the current Canadian Electrical Code CSA C22 1 and CSA 22 1 as applicable and or local codes 2 Other applicable nationally...

Страница 12: ...RECEIVING AND INSTALLING PN 30A255 June 2014 Rev A 12...

Страница 13: ...cation and that provisions are made so that the fryer can be moved to service fryer from the rear Electrical connec tions to the fryer should be made by a licensed electrician and they must conform to...

Страница 14: ...tal LED readout and display board the Ultrastat 25 Cooking Computer has been customized for Ultrafryer Systems applications by the addition of up to 1O stage cooking profiles for each of the 8 product...

Страница 15: ...INITIAL START UP PN 30A255 June 2014 Rev A 15...

Страница 16: ...ure the Fryer s Power ON OFF Switch is in the ON position 2 Ensure the Computer s ON OFF Button is in the OFF position 3 Ensure the Drain Ball Valve Lever is CLOSED 4 Fill the fryer vat with hot or co...

Страница 17: ...PREVENTIVE MAINTENANCE AND TROUBLESHOOTING PN 30A255 June 2014 Rev A 17...

Страница 18: ...r is required all electrical power MUST BE TURNED OFF PRIOR TO performing that service or repair PREVENTIVE MAINTENANCE SCHEDULE DAILY ITEM INSPECT FOR Grease Filters Clean grease filters in the exhau...

Страница 19: ...n AUTHORIZED repairman and or Ultrafryer Systems Customer Service 1 800 525 8130 and provide the infor mation acquired while performing these checks CAUTION ENSURE REPAIRMEN ARE ADVISED THAT FRYER RES...

Страница 20: ...CLEANING PN 30A255 June 2014 Rev A 20...

Страница 21: ...material DO NOT use steel wool abrasive cloths cleaners powders metal knife spatula or any other metal object to scrape stainless steel Scratches on stainless steel are almost impossible to remove 2...

Страница 22: ...PN 30A255 June 2014 Rev A 22 FRYER OPERATION...

Страница 23: ...MELT MODE each time it is turned ON and controls the COOK CYCLES of each product 23 PN 30A255 June 2014 Rev A Controller Door Service Access Door Temperature Probe Hi Limit Switch Ultrastat 25 Cookin...

Страница 24: ...ical Box Assembly 24 PN 30A255 June 2014 Rev A Mercury Contactor Relay 24 VAC Transformer Terminal Block Relay 24 VDC Mechanical Contactor Fuse Holder And Fuses Wires removed from Electrical Box for c...

Страница 25: ...T UP To operate an Ultrafryer Electric Fryer equipped with an Ultrastat 25 Cooking Computer 1 Ensure the Fryer s Power ON OFF Switch is in the ON position 2 Ensure the Computer s ON OFF Button is in t...

Страница 26: ...T BOIL MODE 7 Turn the Power ON OFF Switch for the fryer to the OFF position and CAREFULLY dispose of the boil out solution in a floor drain 8 Use a scrubbing pad to remove carbon buildup from the Ele...

Страница 27: ...PN 30A255 June2014 Rev A 27 TECHNICAL ASSISTANCE ORDERING INFORMATION...

Страница 28: ...pected for damage to shipping containers prior to departure of the delivering carrier Any damage must be notated on the receiving document to facilitate filing of freight claims Carriers must be notif...

Страница 29: ...PN 30A255 June 2014 Rev A 29 RECOMMENDED SPARE PARTS...

Страница 30: ...f the following items should be kept as a spare part in the local area 30 PN 30A255 June 2014 Rev A Description P N U25 Controller 22A621 Hi Limit Switch 18A364 Mechanical Contactor 18A103 Mercury Con...

Страница 31: ...PN 30A255 June 2014 Rev A 31 PARTS IDENTIFICATION...

Страница 32: ...e description and part number Use that part number when ordering a replacement part ITEM DESCRIPTION PN 1 U25 Controller 22A621 2 Snap Light Red 23A103 3 Drain Ball Valve 24A204 4 Toggle Switch 18 204...

Страница 33: ...24 VDC 18A301 4 Relay 24 VAC 18A034 5 Transformer 18A368 6 Terminal Block 23A428 7 Fuse Holder 23A277 8 Mercury Contactor 18A026 9 Mechanical Contactor 18A103 10 Fuse 23A278 11 Push Nut 27A087 10 2 8...

Страница 34: ...PN 30A255 June 2014 Rev A 34 WIRING DIAGRAM...

Страница 35: ...PN 30A255 June 2014 Rev A 35...

Страница 36: ...PN 30A255 June 2014 Rev A 36 ACCEPTABLE ALTERNATE AND REQUIRED HI LIMIT CONSTRUCTION...

Страница 37: ...e U S Fryer on the previous pages with the exception of a Hi Limit The 18A371 Hi Limit described below is the ONLY Hi Limit to be used to meet the requirements for a Canada Fryer Locate the part below...

Отзывы: