Installation and Maintenance Manual
ULTRAFLEX
page 18
of 71 -
HYDRAULIC CYLINDERS FOR OUTBOARD ENGINES
ENGLISH
3.3.1 Bulkhead positioning (mod. UC120E)
WARNING
Install the bulkhead above the waterline.
DANGER
Check that the cable does not touch the sharp parts
when passing through the bulkhead and that there
are no sharp parts in the hole.
1 By means of the drilling template supplied in
the annex, drill a ø 25 mm (1") hole and three 3 mm
(1/8") holes in the bulkhead.
3 Fix the cable clamp to the bulkhead using 3
screws 4.2x19 mm and the relative o-ring seals
supplied.
5 Fix the cable with not edgy plastic electrician's
cable ties.
2 Pass the cable equipped with connector through
the bulkhead.
6 Connect the cables as described in the "INTEGRA
Installation Instructions".
CAUTION
Check that the cable does not hinder and it does not
touch the moving and/or sharp parts to avoid wear
and damage.
4 Loosen the cable gland and adjust the length of
the cable in such a way as to ensure correct cylinder
movement during operation, then tighten the cable
gland again.
CAUTION
Carry out the entire stroke before fixing the cable.