background image

.2

 

  Flywheel 

 

Holes maybe drilled in the flywheel to reduce weight

. It is 

not allowed to reduce the outside diameter or to reduce 
the thickness at any point. 

A part, the weight of which is 

quoted in the homologation sheet, may be machined for 
the specific purpose of reaching the quoted weight only

It is not allowed to change the flywheel, but balance 
machining is allowed if the dimensions and weights are 
still correct. 

As per Stock Class 

As per Stock Class 

FREE 

.3

 

  Conrods 

 

It is allowed to reduce the overall weight of the Conrods 
by removing the flashing on the shank of all three rods to 
attain the weight specified provided for in the 
homologation specifications 

As per Stock Class 

As per Stock Class 

.4

 

+  Electrical 

components 
 

It is forbidden to remove any excess wiring; heat sensors 
modify coils, to rewire coils or other components, to 
tamper with CDI units or to add any electrical 
components (starter etc.) or any other part that is not 
standard original part. 
 

It is allowed to remove any 
excess wiring i.e. heat 
sensors, rev limiters, low oil 
sensors etc. It is forbidden to 
modify coils, to rewire coils 
or other components, to 
tamper with CDI units or to 
add any electrical 
components (starter etc.) or 
any other part that is not 
standard original part. 

As per Stock Class 

FREE 

.5

 

  Head Volume 

 

It is allowed to encroach into the squish pan area in the 
skimming process as long as the minimum combustion 
chamber is maintained. It is not allowed, should this 
minimum be exceeded, to remove the metal within the 
squish pan area to regain the lost volume. Measurement 
of the head volume will be taken with the head removed 
from the block. 

As per Stock Class 

No restrictions 

.6

 

  Head Volume 

Measuring 
procedure and 
modification of 
engine Ports 
 

The head volume is measured off the block, using a glass 
plate of minimum 3 mm thick.  A burette calibrated in 50 
cc increments to be used with a paraffin/oil mix of 50/50. 
All head volumes to be taken with the spark Plug as used 
and correctly fitted. The head is measured with no 
gasket. All old gasket material is allowed to be cleaned 
off. It is also allowed to clean all carbon deposits in the 
head. The glass plate must be sealed with a thin layer of 
marine grease 
When ports in cylinders are adjusted to the dimensions 
specified in the homologation sheet, material may only 
be removed in the specified opening to a depth of 10mm 
not including liner, to match the shape of the original 
adjacent connecting passage (channel) outside the 
adjusted port opening. This also applies to other 
openings in the motor for which the dimensions are 
specified in the homologation sheet. Should the modified 
port window be smaller than the track, the track may not 
be tampered with. 
 

As per Stock Class 

No restrictions 

.7

 

  Throttle advance 

 

On various models, it is allowed to change the position of 
the throttle cable link pin on the advance cam. It is not 
allowed to modify the cam itself or change the radius on 
the cam. [See 563.16.] 

As per Stock Class 

Free 

.8

 

  Cost of inspection 

 

Costs may not be claimed in the case of a mandatory 
inspection by race authority. The maximum costs that 
may be claimed, by a driver from a protestor, should the 
equipment found to be legal, are as follows: 
LABOUR: Time may only be claimed to a maximum of six 
hours at a rate to be determined by their local class 
association or National Authority. Any excess will be 
borne by the owner of the equipment. The above cost 
excludes the cost of gaskets required or lubes which may 
only be changed as per the recommended grade in the 
workshop manual. Freight charges, where applicable, will 
be charged as per the standard international rates. 

As per Stock Class 

As per Stock Class 

.9

 

  Technical 

inspections 
 

The O.O.D. or official scrutineer will be in charge. Only 
the following may attend the post-race engine 
inspections regardless of a protest being lodged. The 
O.O.D - UIM commissioner - Measuring Officer - Driver 
and his mechanic (or representative) - Protestor or his 
representative - Any other person the O.O.D. requires, 
with his permission. Note that in the case of a protest, 
the protestor’s duty is to ensure that the inspection 
complies with his protest requirements. He may not 
however physically inspect the parts himself and should 
not be allowed within a 5m radius of the equipment. 

As per Stock Class 

As per Stock Class 

Содержание 2013 P750

Страница 1: ...ale Motonautique World Governing body of powerboat racing Pre Scrutineering At the beginning of the event Safety Scrutineering Carried out when required or between each discipline Post Scrutineering A...

Страница 2: ...is satisfiedwith the doctor paramedic s report The replacement co driver has thecomplete current paperwork including a currentinternational license No Co Pilot can bechangedduring a heat race or leg T...

Страница 3: ...ES HULLS 561 01 DISCIPLINES M Shape Surf Circuit andLong haul 561 01 HULLS 561 HULLS Number Rule STOCK S PROSTOCK PRO MODIFIED M 011 Engine Capacity Up to 750cc Up to 750cc Up to 750cc 012 Minimum hul...

Страница 4: ...HULL DIAGRAM B HULL DIAGRAM C...

Страница 5: ...s webbing must not sharecommonuse They must beatleast10 mmthick rope and thewebbing minimum25mm wide Allboats mustbe fitted witha 4 meter length ofsimilarmaterial as a designated bowline spliced orsti...

Страница 6: ...MODIFICATIONS No RULE STOCK S PROSTOCK PRO MODIFIED M 1 Replacement The replacement ofnuts or theadditionoflock nuts drilling andwiring split pinning orkeying is allowed provided the screwandpins are...

Страница 7: ...the jets No modifications are allowed to theseparts As per Stock Class FREE 18 Baffle plate Baffle plate orother fuel surgepreventative measures can betaken incarburetor fuelbowls As per Stock Class...

Страница 8: ...33 Exhaust box No protruding expansion exhaustbox As per Stock Class As per Stock Class 34 External water pick up Not allowed As per Stock Class Are allowed 563 34 FUEL Stock and Pro Stock Class Fuel...

Страница 9: ...lowed to becleaned off It is alsoallowed to clean allcarbon deposits inthe head The glass plate must besealed witha thin layerof marine grease When ports in cylinders areadjustedto the dimensions spec...

Страница 10: ...Shown diagrammaticallyin diagram D as a guide only Starts can befrom the beach or deep water starts Note There does nothaveto bebreaking Surfin order to engagethis discipline Althoughit musttake place...

Страница 11: ...per Surf As per Surf 11 1 1 Shore Buoys There should bea minimum of 10meters between the shorebuoys andtheshorewith sufficientwater depth to raceapproximately0 5m This must alsobe evaluated intheEvent...

Страница 12: ...race will belivewhen thegreenflag drops The heat is livewhen the lastrunning boat crosses the start finish linefor thefirst time Ifthe last boat has not passedthestart finishline then the re start is...

Страница 13: ...ded bytheprevious discipline s overall results Thegrid positions for the second heat inthat discipline will beas they finish inthefirst heat The grid positions for the finalheat willbe the aggregatepo...

Страница 14: ...DIAGRAM D OOD Territory area in which a race boat can cross but loses its right of way to other racers must give way in this area DIAGRAM E Over Taking...

Страница 15: ...tputit intill both creware intheboat Option 3 DEEP WATER STARTS Muster area will bedefinedeither inraceinstructions or explainedattheDrivers Briefing Two minutes beforethestart oftheracethe start boat...

Страница 16: ...ay a Yellow Flag theboats must proceed toline upsideby side Thestart boatwill then proceedacross infront ofthefleetand thenreturns back across the front of thefleet when the startboat has crossed thef...

Страница 17: ...DIAGRAM G Guide to Surf Course Layout DIAGRAM H Guide to Circuit Course Layout...

Отзывы: