background image

7

3.2. Preparing the Flex sleeve

Inspection

•  Check the QL Flex and the EPDM-rubber for visible damage.
•  The EPDM rubber is put onto on the sleeve at the factory.

Oil the sleeve

•  Spray the area of the locks and the metal overlap of the QL Flex 
  with an environmentally friendly contact spray.
•  Important: Do not use rubber-dissolving lubricants!
•  In addition, spray the central flexible area of the Quick-Lock Flex sleeve 
  to ensure even run-on and avoid any malfunctions and / or defects in the 
  stainless-steel sleeve.
  Carefully pull the EPDM rubber part of the way downwards.

Cutting the transport tapes

•  Cut half-way through the adhesive tape applied for safe transportation. 
  Put the rubber back into its correct position on the sleeve.

Affixing the EPDM rubber

•  To prevent displacement of the EPDM 
  on the QL Flex during transportation to the  
  damaged area, affix the seal on both sides  
  of the stainless steel sleeve and at the ends  
  above the locks with a drop of super glue.
•  Warning: Under no circumstances  should 
  the glue drip onto the metal overlap, 
  otherwise it will not longer be possible 
  for the sleeve to expand.
•  Warning:  If the rubber is not properly  
  affixed, there is a risk that it might bunch 
  up at a constricted point in the pipe without 
  you noticing.

Position: 6 o‘clock

Position: 12 o‘clock

Содержание Quick-Lock Flex 200

Страница 1: ...Kanaltechnik Quick Lock Flex 200 600 User Manual...

Страница 2: ...lity and materials used 5 3 How to use the system 6 3 1 Preparation 6 3 1 1 Inspecting the pipe 6 3 1 2 Preparing the pipe 6 3 2 Preparing the Flex sleeve 7 3 3 Montage Quick Lock Flex 8 3 3 1 Positio...

Страница 3: ...3 Imprint Uhrig Kanaltechnik GmbH Am Roten Kreuz 2 78187 Geisingen Telefon 49 7704 806 0 https www uhrig bau eu en info uhrig bau de Version 2019...

Страница 4: ...document This manual is a supplement to the Quick Lock Manual This manual describes the specific use of the Quick Lock Flex sleeve Please familiarize yourself with the above Manual before using Quick...

Страница 5: ...Materials Used The system is manufactured using V4A stainless steel grade 1 4404 AISI 316L and an EPDM compression seal These materials are extremely durable in municipal waste water The suitability o...

Страница 6: ...pipe to be repaired must always be cleaned with a high pressure jet before installing Quick Lock Hardened deposits roots and protruding sockets must be removed with appropriate milling tools The pipe...

Страница 7: ...of the way downwards Cutting the transport tapes Cut half way through the adhesive tape applied for safe transportation Put the rubber back into its correct position on the sleeve Affixing the EPDM r...

Страница 8: ...hassis of the packer to the nominal width of the host pipe See also instructions Offset packer with adjustable chassis 3 4 Appendix 4 of the Quick Lock Manual Aligning the sleeve on the packer The sle...

Страница 9: ...he lock is in the 11 o clock or 1 o clock position After installation the lock is always at the top i e in the 12 00 o clock position Balanced sleeve If the Quick Lock sleeve is positioned on the pack...

Страница 10: ...approximately 1 0 1 5 bar so that the sleeve is positioned over the offset in the pipe wall Now allow the sleeve some time to expand Apply pressure to the sleeve slowly and intermittently and wait unt...

Страница 11: ...QL Flex has been installed correctly Pan around the edges of the sleeve The sleeve should now be fully pressed against the wall of the pipe It may be necessary to tighten the sleeve on one side or th...

Страница 12: ...300 VP 250 300 RS 250 SPV 300 RS 300 1 2 238 305 2 7 9 400 16 400 360 349 390 415 25 VP 350 500 RS 400 1 5 330 406 2 8 10 500 20 500 460 446 487 515 25 VP 350 500 VP 500 600 RS 400 SPV 500 RS 500 2 4...

Отзывы: