background image

Page i 

7025 Instruction Manual (Rev.2)

  

 

C O N T E N T S

 

1

 

GENERAL

 .......................................................................................................... 1

 

1.1

 

S

YNCHRONIZED 

START/STOP

 ON MODEL 

7125

 .................................................... 1

 

2

 

INSTRUMENT DESCRIPTION

 ........................................................................... 1

 

2.1

 

K

INEMATICS

.......................................................................................................... 1

 

2.2

 

C

YLINDER

/P

ISTON 

&

 

V

ALVE

 ................................................................................... 2

 

2.3

 

P

UMP 

F

RAME

 ........................................................................................................ 3

 

3

 

INSTALLATION

 ................................................................................................. 3

 

3.1

 

U

NPACKING 

&

 

P

RELIMINARY 

C

HECK

 ...................................................................... 3

 

3.2

 

N

OTES ON THE 

I

NSTRUCTION 

M

ANUAL

 .................................................................... 4

 

3.3

 

B

EFORE 

A

PPLYING 

P

OWER

 .................................................................................... 4

 

3.3.1

 

M

AINS 

S

WITCH

 

4

 

3.3.2

 

F

USE 

H

OLDER

 

4

 

3.3.3

 

M

AINS 

C

ORD

 

4

 

3.4

 

C

ONNECTIONS

 ...................................................................................................... 4

 

3.5

 

A

DDITIONAL 

S

AFETY 

C

ONSIDERATION

 .................................................................... 5

 

4

 

OPERATION

 ...................................................................................................... 5

 

4.1

 

S

WITCHING 

O

N

 ..................................................................................................... 5

 

4.2

 

R

ATE

 ................................................................................................................... 6

 

4.3

 

S

TROKE 

V

OLUME

 .................................................................................................. 6

 

4.3.1

 

V

OLUME 

S

CALE 

R

EADING

 

6

 

4.4

 

V

ENTILATION 

S

TANDARDS FOR 

S

MALL 

M

AMMALS

 ................................................... 7

 

4.5

 

TTL

 

S

TART

/S

TOP 

C

OMMAND

 ................................................................................. 7

 

4.6

 

S

YNCHRONISED 

S

TART

/S

TOP 

M

ODEL 

7125

 ............................................................ 7

 

4.7

 

C

ONNECTION TO 

A

NIMAL

 ....................................................................................... 8

 

5

 

MAINTENANCE

 ................................................................................................. 8

 

5.1

 

E

LECTRICAL

 ......................................................................................................... 8

 

5.2

 

M

ECHANICAL

 ........................................................................................................ 9

 

5.2.1

 

C

HANGING 

C

YLINDER

/P

ISTON 

A

SSEMBLY

 

9

 

5.2.2

 

L

UBRICATING 

L

INKAGE

 10

 

5.2.3

 

L

UBRICATING 

C

YLINDER

/P

ISTON

 11

 

5.2.4

 

L

UBRICATING 

V

ALVE 

G

EAR

 11

 

5.2.5

 

V

ARIABLE 

S

TROKE 

D

ISK

 11

 

5.3

 

L

ONG 

I

NACTIVITY

 ................................................................................................ 12

 

5.4

 

C

USTOMER 

S

UPPORT

 .......................................................................................... 13

 

6

 

CHECKING PUMP PERFORMANCES

 ............................................................ 13

 

6.1

 

S

TROKE 

V

OLUME

 ................................................................................................ 13

 

Содержание 7025 Series

Страница 1: ...UGO BASILE S R L sales ugobasile com service ugobasile com www ugobasile com instruction manual Rodent Ventilator Cat No 7025 7125...

Страница 2: ...LLOWED TO ENSURE SAFE OPERATION AND TO RETAIN THE INSTRUMENT IN SAFE CONDITIONS SERVICE AND ADJUSTMENTS SHOULD BE CARRIED OUT BY QUALIFIED PERSON NEL AUTHORIZED BY UGO BASILE ORGANIZATION ANY ADJUSTME...

Страница 3: ...ith 5 10 or 30ml cylinder piston assembly Its precisely regulated geared motor speed provi des the most accurate and reliable stroke rate con trol of any respirator available The operation of the 7025...

Страница 4: ...7033 1 LITHIUM GREASE GRASSO AL LITIO 7032 1 PERSPEX LID COPERCHIO E AU 041 7025 302 1 INSTRUCTION MANUAL on USB pen drive MANUALE DI ISTRUZIONE su chiavetta USB CYLINDERS 7025 7125 7026 1 10ml CYLIN...

Страница 5: ...3 5 ADDITIONAL SAFETY CONSIDERATION 5 4 OPERATION 5 4 1 SWITCHING ON 5 4 2 RATE 6 4 3 STROKE VOLUME 6 4 3 1 VOLUME SCALE READING 6 4 4 VENTILATION STANDARDS FOR SMALL MAMMALS 7 4 5 TTL START STOP COMM...

Страница 6: ...CONFIGURATIONS 18 8 3 OTHER AVAILABLE CYLINDER PISTON ACCESSORIES 19 8 4 TO COMPLETE YOUR EQUIPMENT 19 9 BIBLIOGRAPHY 21 FIGURE INDEX Figure 1 Linkage 2 Figure 2 Power Module 4 Figure 3 Front Panel 5...

Страница 7: ...electronic noise broadcasting 1 1 Synchronized START STOP on model 7125 The operation of the Rodent Ventilator may be paused by an external TTL logic signal For more demanding electrophysiological pha...

Страница 8: ...raduation marks on the cylinder either of which leads to uncomfortable volume setting the latter adjustable only when the pump is in motion The mechanism does not incorporate the slotted link assembly...

Страница 9: ...ft wall the side of the air ports by two M4 oval head screws The combination wall plate forms a solid T structure which glides out from the rails of an all welded 4 sided cabinet by simply removing th...

Страница 10: ...the serial number of your instrument 3 3 Before Applying Power Consider the Power Module on the in strument back panel which encompasses from left to right the inlet connection of the mains cord the m...

Страница 11: ...tilator UGO BASILE DOES NOT ACCEPT ANY RESPONSIBILITY FOR PROB LEMS OR HARM CAUSED TO THINGS OR PERSONS ARISING FROM incorrect electrical supply incorrect installation procedure incorrect or improper...

Страница 12: ...alue between 150 and 150 9 4 3 Stroke Volume The stroke volume is adjustable via the STROKE VOLUME knob 14 see Figure 1 Linkage located on the front panel see Figure 3 Front Panel while the pump is ei...

Страница 13: ...which would be unavoidable via crude ON OFF power switching Pause timing ought not to be too long nor too frequent Compensating a pause with a faster rate may help pause when the lungs are full For m...

Страница 14: ...intake 5 MAINTENANCE While any service of the instrument ought to be carried out by Ugo Basile personnel or by qualified personnel authorized by UGO BASILE organization this section of the instruc tio...

Страница 15: ...ock Figure 6 Cylinder Piston Assembly Pull the cylinder outward to detach it from the valve block about 0 5cm The cylinder may require a gentle side knock to pop out as grease film on its bot tom may...

Страница 16: ...to our after sales service see 5 4 Customer Support Make sure that 1 a film of grease is evenly smeared on the cylinder bottom to make the fit air tight 2 the cylinder and block ports match correctly...

Страница 17: ...ole 5 2 4 Lubricating Valve Gear The valve gear is lubricated via the grease cup 22 placed on the valve block top see Figure 6 Cylinder Piston Assembly A lithium grease tube is supplied with the stand...

Страница 18: ...the disk inches from the preset volume by itself adjust the set screw accordingly See paragraph 7 2 for the Access to the Inside of the Instrument Bear in mind that as little as 1 8 turn of the set s...

Страница 19: ...NG PUMP PERFORMANCES 6 1 Stroke Volume If you have any reason to suspect that the output of the pump at any given setting is not that giv en on the graduation marks on the scale 15 there is a simple a...

Страница 20: ...ontally to minimize gravity effect on the plunger travel The limits of its travel will indicate the actual amount of air being supplied by the pump at each stroke To check stroke to stroke volume use...

Страница 21: ...continuous operation To inspect the valve remove the cylinder see paragraph 5 2 1 Changing Cylinder Piston Assembly then remove the spindle snap ring and push out its gudgeon 5 Swing the link 8 aside...

Страница 22: ...of the Instrument Remove the six M4 oval headed screws indicated in Figure 10 Access to the Inside of the Instrument on page 16 with the 2 5 mm Allen wrench provided Pull out the plate wall assembly s...

Страница 23: ...STROKES PER MINUTE of the running ven tilator Compare this figure with the indication of the ventilator digital display Adjust a possible discrepancy via trimmer pot R23 D Check the STROKES PER MINUT...

Страница 24: ...U 041 USB pen drive including 7025 302 Instruction Manual on USB 8 1 Other Available Configurations 7025 30 Rodent Ventilator complete with 30ml cylinder piston standard accessories 7025 5 Rodent Vent...

Страница 25: ...th suitable link 7026 10 ml Cylinder Piston Assembly complete with gudgeon 7027 30 ml Cylinder Piston Assembly complete with gudgeon 7135 Set of two O rings for 1 ml piston 7129 Set of two O rings for...

Страница 26: ...ete line of Anesthesia Systems and accessories series 21100 the ideal match to our Ventilators 21100 Single Output Anesthesia System including Basic Single Output Anesthesia System scaven ger Activate...

Страница 27: ...ion Inhibits the Neurogenic Tachycardic and Vasopressor Response in Rats via Presynaptic Canna binoid Type 1 Receptor J Pharmacol Exp Therap 343 198 205 2012 A Andersen et alia Ischemic Preconditionin...

Страница 28: ..._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Страница 29: ..._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Страница 30: ..._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Страница 31: ...ured in compliance with the following European Union Directives and relevant harmonized standards 2006 95 CE relating to electrical equipment designed for use within certain voltage limits 2004 108 CE...

Отзывы: