background image

 

S9700-23D Hardware Installation Guide | 29 

Installation Location Statement 

 

It is recommended that the device be installed only in a server room or computer 
room where access is:

 

 

Restricted to qualified service personnel or users familiar with restrictions 

applied to the location, reasons therefore, and any precautions required.

 

 

Only afforded by the use of a tool or lock and key, or other means of security, 

and controlled by the authority responsible for the location. 

Suitable for installation in Information Technology Rooms in accordance with Article 
645 of the National Electrical Code and NFPA 75. 

 
 

Cautions and regulatory compliance statements for NEBS: 

 

“Suitable for installation as part of the Common Bonding Network (CBN)” 

 

 

“An external Surge Protection Device (SPD) must be used with AC powered equipment 
and that the Surge Protection Device is to be installed at the AC power service entrance.”

 

 

“System can be installed in Network Telecommunications Facilities where the Nat

ional 

Electric Code applies”

 

 

The approximate system boot time when the AC (or DC) power source is connected is 
110 secs in Ubuntu Linux system. (The boot up time would depend on different NOS 
system) 

 

The approximate link time for the OOB Ethernet port when reconnected is 40 secs base 
on Ubuntu Linux system (The link time would depend on different NOS system) 

 

The design of the equipment is that the RTN terminal should be isolated from the chassis 
or rack. (The DC input terminals is DC-I (Isolated DC return)) 

 

“WARNING: The intra

-building port OOB (Ethernet) of the equipment or subassembly is 

suitable for connection to intra-building or unexposed wiring or cabling only. The 
intrabuilding port(s) of the equipment or subassembly MUST NOT be metallically 
connected to interfaces that connect to the OSP or its wiring for more than 6 meters 
(approximately 20 feet). These interfaces are designed for use as intra-building interfaces 
only (Type 2, 4, or 4a ports as described in GR-1089) and require isolation from the 
exposed OSP cabling. The addition of Primary Protectors is not sufficient protection in 

order to connect these interfaces metallically to an OSP wiring system.”

 

Содержание S9700-23D

Страница 1: ...Hardware Installation Guide S9700 23D Core Edge Router R1 0...

Страница 2: ...SU Overview 7 Fan Overview 8 Port Overview 9 5 Rack Mounting 10 6 Installing Fan Modules 13 7 Installing Power Supply Units 14 8 Grounding the Router 16 9 Connecting Power 18 DC Version 18 AC Version...

Страница 3: ...00 23D enables service providers to meet the high traffic loading in 5G application scenarios In the past monolithic chassis was the only solution for carrier aggregation and core networks now the S97...

Страница 4: ...ow wire for grounding Crimping tool Wire stripping tool All illustrations within this document are for reference purposes only Actual objects may differ PC with terminal emulation software Refer to th...

Страница 5: ...r circuit Space Clearance The S9700 23D chassis width is 17 16 inches 43 6cm and is shipped with an adjustable mounting rail kit suited for standard 19 inch 48 3cm wide racks The depth of the S9700 23...

Страница 6: ...lation spacing requirement S9700 23D chassis spacing requires a height of 2RU 3 45 8 8cm a width of 19 48 3cm and a depth of 42 inches 106 6cm Thermal requirement S9700 23D working temperature is 0 C...

Страница 7: ...5 x 12 5mm 1 pcs 0 03lbs 15 3g 1 pcs 2 Screw Kit for Grounding Lug 2 x Screw M4 L8 0mm 2 x M4 Lock Washers 2 sets 0 01lbs 2 6g 1 set 3 Micro USB Cable 3 28 1m 1 pcs 0 05lbs 24 4g 1 pcs 4 RJ45 to DB9...

Страница 8: ...C PSU 2 65lbs 1 2kg AC PSU 2 65lbs 1 2kg Fan module 1 10lbs 498g Ground lug 0 15lbs 66 2g Adjustable mounting rail 7 05lbs 3 2kg Micro USB cable 0 05lbs 24 4g RJ45 to DB9 Female cable 0 23lbs 105g AC...

Страница 9: ...23D Hardware Installation Guide 7 4 Identifying Your System S9700 23D Overview Figure 4 PSU Overview Power supply unit PSU with 1 1 Redundancy Hot swappable field replaceable unit FRU AC Version Figu...

Страница 10: ...S9700 23D Hardware Installation Guide 8 DC Version Figure 6 Fan Overview 3 1 Redundant hot swappable field replaceable unit FRU Figure 7...

Страница 11: ...akout 0 12 QSFP DD 328ft 100m 400GE The service ports labelled in blue in figure below are ethernet packet based ports used to connect to servers and other networking equipment The fabric ports labell...

Страница 12: ...ail from the outer rail The white tab is located on the inner rail 1 3 Once the inner rail is separated push the tab located on the outer rail to unlock and slide the middle rail back Figure 9 2 Insta...

Страница 13: ...e heard when the bracket is secured onto the rack Figure 11 4 Insert the Chassis to complete the installation 4 1 Pull the middle rail fully extended into lock position an audible click can be heard w...

Страница 14: ...S9700 23D Hardware Installation Guide 12 Figure 12...

Страница 15: ...n module Then press and hold the release tab to unlock the fan module Figure 13 2 While holding down the release tab grip the fan handle and gently pull the fan module out of the fan bay Figure 14 3 A...

Страница 16: ...power input for AC power supply is only 110V there will only be 1000 watts per power supply and will not be enough power for the power supply to be changed while the router is in operation In order fo...

Страница 17: ...PSU s power connector is in the correct position 4 Carefully slide the new PSU into the power bay and gently push until it is flush with the case 5 An audible click will be heard when the PSU is inst...

Страница 18: ...onto the case This equipment must be grounded Do not defeat the ground conductor or operate the equipment without correctly grounding the equipment If there is any uncertainty about the integrity of...

Страница 19: ...or securing the grounding lug which is located on the rear of the router and remove the protective label Figure 20 6 Using 2 M4 screws and 4 washers provided with the package contents firmly lock the...

Страница 20: ...lug before connecting to the PSU The following instructions are for connecting the DC Power Cable to the lug 2 1 Strip the insulation from a DC Power Cable leaving 0 5 0 02 12 7mm 0 5mm of exposed cab...

Страница 21: ...lled DC version with insulation material as below Figure 24 3 Attach the power cable Locate the DC power screw type terminal block located on the PSU Remove the plastic cover that is protecting the te...

Страница 22: ...se based on the PSU maximum capacity which will act as a second tier system protection in case the power distribution unit s fuse is not functioning 6 Verify that the power supply is operating If conn...

Страница 23: ...e power distribution unit s fuse is not functioning 4 Verify that the power supply is operating If connected correctly when turned on the LED on the PSU will light up with a solid Green color designat...

Страница 24: ...id Amber Power is up but Host CPU BMC is not up Blinking Amber Reserved FAN OFF No FAN modules present or FAN modules are not initialized Solid Green All FAN modules are working well Blinking Green Re...

Страница 25: ...hutdown failure over current short circuit over voltage fan failure and or over temperature Blinking Red 1 sec Input power cord unplugged or input power lost with a second power supply in parallel sti...

Страница 26: ...ing with micro USB drivers will need to be installed To connect the console using the RJ45 IOIO port locate the port labelled IOIO then plug a serial cable into the console port and connect the other...

Страница 27: ...the CLI The username and password should be provided by the Network Operating System NOS vendor 12 Cable Connections Connecting the USB Extender Cable Connect the USB 3 0 A Type plug male connector i...

Страница 28: ...during handling It is also recommended the cabling be done by a professional who is grounded such as by wearing an ESD wrist strap The following the steps below for connecting a transceiver 1 Remove t...

Страница 29: ...ice ensure that the rack can support it without compromising stability Otherwise personal injury and or equipment damage may result Caution This unit must be installed indoors The unit AC power suppli...

Страница 30: ...rference at his own expense Changes or modifications made to this device which are not expressly approved by the party responsible for compliance could void the user s authority to operate the equipme...

Страница 31: ...he National Electric Code applies The approximate system boot time when the AC or DC power source is connected is 110 secs in Ubuntu Linux system The boot up time would depend on different NOS system...

Страница 32: ...www ufispace com www ufispace com...

Отзывы: