S9501-18SMT
Hardware Installation Guide | 4
•
Cooling: The
S9501-18SMT
airflow direction is front-to-back.
Make sure the equipment
on
the same rack have the same airflow direction.
Figure 3.
Rear wall clearance =
2
.0”
Boom DUT
Top DUT
AIR FLOW
AIR
AIR
AIR
AIR
AIR
Figure 4.
2.3
Preparation Check List
Task
Check
Date
Power voltage and electric current requirement
DC version
: -
48V DC, 8-4 ampere maximum or;
AC version:
100-240V, 3-1.5 ampere
Installation spacing and weight load requirement:
S9501-18SMT
is 1RU (1.75”/4.5cm) in height, 19” (48.3cm) in width,
and 16” (40.6cm) in depth without considering cable routing
Thermal requirement
S9501-18SMT
working temperature is -40
to 65°C (-40°F to 149°F),
airflow direction is front-to-back
Installation
tools require
d
#2 Philips Screwdriver, 6-AWG wire stripper, and crimping tool
Accessories required
PC with terminal emulation software, console cable, 14-AWG
wire with ring terminal for power, 6-AWG wire for grounding
Содержание S9501-18SMT
Страница 1: ...S9501 18SMT Disaggregated Cell Site Gateway Hardware Installation Guide R1 0...
Страница 29: ...www ufispace com...