background image

17

REPLACING THE BATTERIES

POST TEST

PERIODIC SERVICE

ANNUAL RE-CERTIFICATION

CLEANING

This meter has been designed for use with both alkaline and rechargeable Nickel Metal Hydride (NiMH) batteries . No other types are 

recommended . The analyzer is supplied with 4 “AA” size alkaline batteries . These should be installed into the instrument as shown in the 

diagram indicated on the back of the unit .

 CAUTION!

 

Take great care when installing the batteries to observe correct polarity .  

 

 

 

 

 

 

Always check the meter for operation immediately after installing    

 

 

 

 

 

 

new batteries .

Using Re-Chargeable Batteries

The battery charger must only be used when NiMH batteries are fitted .  Alkaline batteries are not re-chargeable . Attempting to recharge 

alkaline batteries may result in damage to the product and may create a fire risk .

Battery Charging

Ensure that you use the correct charger . This unit uses a 9V DC regulated charger . Ensure that the batteries are fitted in the correct manner, 

and then charge for at least 16 hours . Subsequent charges should be overnight . NiMH batteries may be charged at any time, even for short 

periods to conduct testing .

 

WARNING!

 

Under NO circumstance should you expose batteries to extreme heat or fire as they may explode and cause injury . Always  

 

dispose of old batteries promptly in a manner consistent with local disposal regulations .

WARNING!

Repair and service of this instrument is to be performed by qualified personnel only . Improper repair or service could result in 

physical degradation of the instrument . This could alter the protection from personal injury this meter provides to the operator . 

Perform only those maintenance tasks that you are qualified to do .

Remove the probe from the flue and allow the analyzer to purge 

with fresh air until readings return to zero . - O2 to 20 .9%, CO to 

Zero (Be careful as the probe tip will be HOT)

C225

L O N G   L I F E   E O S   A N A LY Z E R

CO

2

 CO TEMP

Menu

Status

Aux

Fuel

Flue Test

Prs

Exch

Test

Temp

Room

CO

Up

Down

Enter

O2% 20.9

COp  000

P    000

TFf  000

Drain water trap by unplugging 

the drain plug and shake to 

get excess water out .

Check particle filter for dirt 

and any other sediment and 

replace if necessary .

While the CO sensor has an expected life of more than five years in normal use it is recommended that the analyzer is re-certified at least annually, 

This is so that long-term drift on the sensor and electronics can be eliminated . Local regulations may require more frequent re-calibration and 

users should check with appropriate authorities to ensure they comply with relevant guidelines .

Periodically clean your instruments case using a damp cloth . DO NOT use abrasive, flammable liquids, cleaning solvents, or strong detergents as 

they may damage the finish, impair safety, or effect the reliability of the structural components .

www.

.com

[email protected]

1.800.561.8187

Содержание C257

Страница 1: ...nter I N D U S T R I A L E O S A N A L Y Z E R CO2 H2CO T PRS O2 9 7 COp 28 P 1 47 TFf 87 4 C255 C257 1 800 547 5740 Fax 503 643 6322 www ueitest com Email info ueitest com INSTRUCTION MANUAL ENGLISH...

Страница 2: ...n Measurement Terms 14 Specifications 15 Electromagnetic Compatibility 15 Limited Warranty 16 DISPLAY SYMBOLS Excess Air Theoretical amount of air in excess of level needed to completely burn fuel Eff...

Страница 3: ...sure SEND ENTER to Select and Print press and hold to log current values Particle Filter Inside Water Trap Water Trap Protective Rubber Boot w built in Magnets Battery Charge AC Adapter Flue Gas Inlet...

Страница 4: ...O N G L I F E E O S A N A L Y Z E R CO2 CO TEMP Menu Status Aux Fuel Flue Test Prs Exch Test Temp Room CO Up Down Enter MENU SETUP C225 L O N G L I F E E O S A N A L Y Z E R CO2 CO TEMP Menu Status A...

Страница 5: ...P Menu Status Aux Fuel Flue Test Prs Exch Test Temp Room CO Up Down Enter LANGUAGE ENGLISH C225 L O N G L I F E E O S A N A L Y Z E R CO2 CO TEMP Menu Status Aux Fuel Flue Test Prs Exch Test Temp Room...

Страница 6: ...N G L I F E E O S A N A L Y Z E R CO2 CO TEMP Menu Status Aux Fuel Flue Test Prs Exch Test Temp Room CO Up Down Enter RESET GAS ZERO IN FRESH AIR C225 L O N G L I F E E O S A N A L Y Z E R CO2 CO TEM...

Страница 7: ...CH Heat exchange integrity test TEMP and ROOM CO tests Press ENTER to view Press s UP or t DOWN to select VIEW DEL ALL or EXIT Select View to display logs Select Del All to erase records or Exit to mo...

Страница 8: ...A L Y Z E R CO2 CO TEMP Menu Status Aux Fuel Flue Test Prs Exch Test Temp Room CO Up Down Enter AUX LINE 1 NOp_ N F C225 L O N G L I F E E O S A N A L Y Z E R CO2 CO TEMP Menu Status Aux Fuel Flue Te...

Страница 9: ...ck adjust cone to aprox 2 from end of probe Rotate dial to Flue Test Rotate dial to Status The status menu shows battery life time date and the number of days until suggested re certification CAL Rota...

Страница 10: ...Room CO Up Down Enter I N D U S T R I A L E O S A N A L Y Z E R CO2 H2CO T PRS O2 9 7 COp 28 P 1 47 TFf 87 4 Menu Status Aux Fuel Flue Test Prs Exch Test Temp Room CO Up Down Enter C225 I N D U S T R...

Страница 11: ...rning on and after readings have stabilized press the SEND button This will store the Pre Blower test segment After the blower turns on press PUMP to start the Post Blower test The meter will wait 60...

Страница 12: ...page 7 Press the PUMP button to start the test CO readings peak will be logged every 2 minutes for a 30 minute time span To see logged results see page 7 Menu Status Aux Fuel Flue Test Prs Exch Test T...

Страница 13: ...E after a 4 second countdown and automatically zero the pressure sensor Analyzer model number time date and countdown will show C225 L O N G L I F E E O S A N A LY Z E R CO2 CO TEMP Menu Status Aux Fu...

Страница 14: ...O2 CO Stack Temp Efficiency Hi Low fire Gas Pressure Supply and Return Water temp 80 Furnace Verify proper combustion O2 CO Stack Temp Vent Pressure Efficiency Verify Set Up Gas Pressure Test Limit S...

Страница 15: ...9 O2 Stack Temperature 325 to 500 F Draft Water Column Inches 02 to 04wc Carbon Monoxide parts per million 100ppm Gas Fired Power Burners Oxygen 3 to 6 O2 Stack Temperature 275 to 500 F Stack Draft W...

Страница 16: ...the pump and sensors that will cause damage The filter MUST be changed when it appears discolored on the inner surface Remove water trap assembly from the analyzer as shown above Remove the filter an...

Страница 17: ...local disposal regulations WARNING Repair and service of this instrument is to be performed by qualified personnel only Improper repair or service could result in physical degradation of the instrumen...

Страница 18: ...nd the stack tempera ture and then reference a slide scale that would give you the relative efficiency number UEi s electronic combustion analyzers perform the measurements on a continuous basis and c...

Страница 19: ...C 0 3 reading 3 6 F 2 0 C Inlet Temperature Internal sensor 32 122 F 0 50 C 1 0 F C 0 3 reading 1 8 F 1 0 C Inlet Temperature External sensor 32 1112 F 0 600 C 1 0 F C 0 3 reading 3 6 F 2 0 C Gas Mea...

Страница 20: ...products All recertification services are warranted for one year Save time with online recertification check in by visiting www ueitest com and click the SERVICE REQUEST banner and filling out the for...

Отзывы: