Determining the start of the test
EN-16
Performing the test
EN-17
Cycle
length
(days)
Start
of test
(day)
Cycle
length
(days)
Start
of test
(day)
≤ 21
5
31
15
22
6
32
16
23
7
33
17
24
8
34
18
25
9
35
19
26
10
36
20
27
11
37
21
28
12
38
22
29
13
39
23
30
14
40
24
Example of a cycle length of 28 days: The
table of cycle lengths above indicates the start
of the test at 12 days after the start of the
cycle. If the cycle starts on the 3rd of a month,
performance of the Ovulation Test would start
on the 15th of that month.
Sun Mon Tue Wed Thu
Fri
Sat
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Start of cycle
Start of performance of test
Handle
Urine
Result window
Max. immersion
depth
Opening for
urine sample
Check line
Test line
Have ready a watch with a second hand and if
necessary a clean container for your urine.
Open the foil pouch just before you are ready
to perform the test.
Take the test stick out of the foil pouch. Please
dispose of the enclosed desiccant unopened
in the regular household waste.
Collect your urine sample in a clean, dry con-
tainer. Hold the opening for the urine sample
in the collected urine for approx. 3 seconds.
Important:
Do not exceed the marking for the
maximum immersion depth.
Alternatively, you can also hold the test stick directly
in the urine stream for approx. 3 seconds (see illus-
tration). However, we do recommend that you carry
out the test by immersing the test stick in your col-
lected urine sample. This is the best way of ensur-
ing that the test strip is optimally moistened.
Now lay the test stick on the foil pouch for
5 minutes.
Содержание cyclotest 9030
Страница 22: ......