background image

EVK-M8T User Guide 

 

UBX-14041540 - R05 

Specifications

  

Page 5 of 22 

Early Production Information 

 

2

 

Specifications 

Parameter 

Specification 

Serial Interfaces 

1 USB V2.0  

1 RS232, max. baud rate 921,6 kBd 
DB9 +/- 12 V level  
14 pin – 3.3 V logic 

1 DDC (I2C compatible) max. 400 kHz 

1 SPI – clock signal max. 5,5 MHz – SPI DATA max. 1 Mbit/s 

Timing Interfaces 

2 Time-pulse outputs 

1 Time-mark input 

Dimensions 

105 x 64 x 26 mm 

Power Supply 

5V via USB or external powered via extra power supply 
pin 14 (V5_IN) 13 (GND) 

Normal Operating temperature 

 

-40°C to +65°C 

Table 2: EVK-M8T specifications 

 

2.1

 

Safety precautions  

EVK-M8T must be supplied by an external limited power source in compliance with clause 2.5 of the 
standard IEC 60950-1. In addition to an external limited power source, only separated or Safety Extra-
Low Voltage (SELV) circuits are to be connected to the evaluation kit, including interfaces and 
antennas.  

For more information about SELV circuits see section 2.2 in Safety standard IEC 60950-1 .  

 

Warnings and certifications 

 

 

CAUTION! IN THE UNLIKELY EVENT OF A FAILURE IN THE INTERNAL 
PROTECTION CIRCUITRY THERE IS A RISK OF AN EXPLOSION WHEN CHARGING 
FULLY OR PARTIALLY DISCHARGED BATTERIES. REPLACE THE BATTERY IF IT 
NO LONGER HAS SUFFICIENT CHARGE FOR UNIT OPERATION. CONTROL THE 
BATTERY BEFORE USING IF THE DEVICE HAS NOT BEEN OPERATED FOR AN 
EXTENDED PERIOD OF TIME. 

 

 

Products marked with this lead-free symbol on the product label comply with the 
“Directive 2002/95/EC of the European Parliament and the Council on the 
Restriction of Use of certain Hazardous Substances in Electrical and Electronic 
Equipment” (RoHS). 

EVK-M8T evaluation kit is RoHS compliant and green (no halogens). 

Содержание EVK-M8T-0-01

Страница 1: ...stract This document describes the structure and use of the EVK M8T evaluation kit and provides information for evaluating and testing u blox M8 positioning technology for timing and raw data applicat...

Страница 2: ...available at www u blox com under Support Product Resources Conformity Declaration u blox or third parties may hold intellectual property rights in the products names logos and designs included in th...

Страница 3: ...3 3 Serial port default configuration 6 4 Device description 7 4 1 Interface connection and measurement 7 4 2 Active antenna 7 4 3 Evaluation unit 7 4 3 1 Antenna connector 7 4 3 2 USB 7 4 3 3 UART 8...

Страница 4: ...ects Evaluation Kit Description Suitable for EVK M8T u blox M8 Timing GNSS Evaluation Kit NEO M8T LEA M8T Table 1 List of products supported by EVK M8T evaluation kit 1 2 Kit includes Evaluation unit...

Страница 5: ...nal limited power source only separated or Safety Extra Low Voltage SELV circuits are to be connected to the evaluation kit including interfaces and antennas For more information about SELV circuits s...

Страница 6: ...Set slide switch to I2C SPI I2C compliant DDC Connect corresponding pins see Table 5 for pin description Set slide switch accordingly to SPI or I2C Press the RST button after changing the switch 2 Th...

Страница 7: ...0 mA 4 3 Evaluation unit Figure 2 shows the front and the rear panel of the EVK M8T evaluation unit Front panel Rear panel Figure 2 EVK M8T evaluation unit front and rear panels 4 3 1 Antenna connecto...

Страница 8: ...n The RST button on the front panel resets the unit To avoid an inadvertent reset the button is recessed 4 3 5 Safe boot button This is used to set the unit in safe boot mode In this mode the receiver...

Страница 9: ...ction for over all current measurement see Figure 5 10 P2A O 3 0 V Battery output unloaded 100 1 resistor for battery backup current measurement to pin 9 P2B NOTE There is a current protection to 3 mA...

Страница 10: ...CR2450 The battery has a rated capacity of 540 mA The battery operating temperature range is 40 C to 85 C If the built in backup battery runs low or is empty after a long storage period purchase the b...

Страница 11: ...download all the Aiding Data via the AssistNow Online service 3 Read the voltage and average if necessary on the voltmeter and convert to current 1 mV equals 1 mA 4 Perform the test with good signals...

Страница 12: ...e save configuration box in u center otherwise the configuration will be lost Communications to the evaluation kit must be via the UART I2C or SPI not USB The evaluation kit can be supplied via the US...

Страница 13: ...EVK M8T User Guide UBX 14041540 R05 Block diagram Page 13 of 22 Early Production Information 7 Block diagram Figure 5 EVK M8T block diagram...

Страница 14: ...ide UBX 14041540 R05 Board layout Page 14 of 22 Early Production Information 8 Board layout Figure 6 shows the EVK M8T board layout PCB Version B See Table 6 for the component list of the EVB Figure 6...

Страница 15: ...M PITCH DISCONNECTABLE CRIMP CONNECTOR 40 85C J6 CON 1 ROW THT 100MIL GRID 2PINS 0 64MM SQUARE 6 1MM HEIGHT L2 IND MURATA LQW15A 0402 120N 5 0 64A 55 125C Q1 MBT3906DW1T1G DUAL GENERAL PURPOSE TRANSIS...

Страница 16: ...EVK M8T User Guide UBX 14041540 R05 Schematic Page 16 of 22 Early Production Information 9 Schematic Figure 7 Schematic EVK M8T DNI TRUE in the schematic means Component not installed...

Страница 17: ...41540 R05 Battery replacement Page 17 of 22 Early Production Information 10 Battery replacement To replace the battery Number 5 in Figure 8 open the unit unscrew four screws on the front panel Figure...

Страница 18: ...le on your computer will show up in the COM port drop down list If a COM Port is gray another application running on this computer is using it The position is off by a few dozen meters u blox M8 GNSS...

Страница 19: ...ngs aren t good This provides safety as it is no longer possible to accidentally program a bad configuration e g disabling the main communication port The EVK M8T does not work properly when connected...

Страница 20: ...have an impact on signal travel time The position of the GNSS receiver is typically not the same between two tests Comparative tests should therefore be conducted in parallel by using one antenna and...

Страница 21: ...ocumentation and to receive product change notifications register on our homepage www u blox com Revision history Revision Date Name Comments R01 07 Nov 2014 amil alnu Advance Information R02 07 Jan 2...

Страница 22: ...p u blox com Regional Office China Beijing Phone 86 10 68 133 545 E mail info_cn u blox com Support support_cn u blox com Regional Office China Chongqing Phone 86 23 6815 1588 E mail info_cn u blox co...

Отзывы: