4
5-Port TOUGHSwitch
™
PoE Quick Start Guide
Hardware Installation
Mount the TOUGHSwitch on a wall or place it on a bench top.
Note:
Keep 20 mm of clearance next to the ventilation
holes for adequate airflow.
Wall-Mounting
Installation Requirements
• Drill and 6 mm drill bit
• Phillips screwdriver
Instructions
To mount the TOUGHSwitch on a wall:
1. Use a 6 mm drill bit to drill two holes 60 mm apart.
2. Insert the M2.9 Anchors into the holes.
3. Use a Phillips screwdriver to secure a M2.9x20 Screw to each
anchor. Leave a clearance of approximately 3 mm between
each screw head and its anchor.
60 mm
3 mm
Note:
You can also mount the TOUGHSwitch in a
horizontal orientation.
Содержание TouchSwitch Poe TS-5-POE
Страница 1: ...5 Port Power over Ethernet Managed Switch Model TS 5 POE ...
Страница 2: ......
Страница 19: ......