.
Φ3.2
Φ3.2
Φ3.2
Make sure that the shower enclosure is sitting flat and
even on the base.
Drilling holes through each of the six holes in the wall panels
and into the wall channels.
3C. Reinforcing installation of stationery panels
10
Fix the position connect with wall panels
and wall channels