![Uberhaus L-GZ924PCO-NEW Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/uberhaus/l-gz924pco-new/l-gz924pco-new_instruction-manual_3183063016.webp)
R2
E1
UP / OUT
R1
R1
R2
R3
R3
E1
R2
UP / OUT
16
ASSEMBLY INSTRUCTIONS
16-3. Lock PC panel 1 (R1) to PC panel 2
(R2) and then fully insert the PC
panel 1 (R1) to the upper slot of top
beam (E1).
17. Attach decorative railings 3/4 (I3/I4) to
top beam (E1) and top side beam1/2
(E2/E3) using bolts (AA) and washers
(BB).
16-2. Lock PC panel 2 (R2) to PC panel 3
(R3) and then insert PC panel 2 (R2)
to the middle slot of top beam (E1),
do not fully insert.
16-2
16-3
17
AA
BB
I4
I3
E1
R1
Hardware Used
AA
M6 Flat Washer
BB
M6
x
15 Bolt
x 5
x 5