![Uberhaus L-GZ924PCO-NEW Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/uberhaus/l-gz924pco-new/l-gz924pco-new_instruction-manual_3183063015.webp)
15
ASSEMBLY INSTRUCTIONS
14. Attach top side beams 2/3 (E2/E3) to
posts 1/2 (A1/A2) using bolts (FF) and
flat washers (BB). Repeat this step to
attach top side beam 2/3 (E2/E3) to
posts 3/4 (A3/A4).
15. Insert PC panels 4/6 (R4/R6) and PC
panels 5/7 (R5/R7) to side beams 1/2
(D1/D2) and top side beams 2/3 (E2/E3).
16-1. Insert PC panel 3 (R3) to the lower slot
of the top beam (E1), do not fully insert.
14
15
E2 E3
C2 C1
A1 A2
FF
BB
E2 E3
R5 R7
D1 D2
R4 R6
R3
E1
C2
Hardware Used
M6 Flat Washer
BB
x 8
x 8
FF
M6
x
25 Bolt
UP / OUT
16-1