Page
21
Step 15
15.1. From the front of the gazebo, slide the five Roof Supporting Tubes (L) until they touch the Roof
Panels (K).
15.2. From the front of the gazebo, slide the five remaining Main Roof Panels (K) in the lower part of
the Roof Holder Bars until they reach the Roof Supporting Tubes (L).
Содержание 72255118
Страница 14: ...Page 14 Step 8 8 Attach the Rail E to the Rail D with Screws T...
Страница 15: ...Page 15 Step 9 9 Attach the Connectors P to the assembled Lintels D F G with Screws V...
Страница 18: ...Page 18 Step 12 12 Attach the Back Roof Holder Bar H with Screws V...
Страница 19: ...Page 19 Step 13 13 Attach the Side Caps M M1 with Screws V...
Страница 37: ...Page 37 tape 8 8 Installez les rails E sur les rails D l aide des vis T...
Страница 38: ...Page 38 tape 9 9 Vissez les corni res P aux linteaux assembl s D F et G en utilisant les vis V...
Страница 41: ...Page 41 tape 12 12 Installez les barres de finition de toit arri re H en utilisant les vis V...
Страница 42: ...Page 42 tape 13 13 Installez les couvre barres lat raux M et M1 en utilisant les vis V...