6
Hardware Pack 2
Part
Description
Quantity
Image
BB
M6 Flat washer
16P CS
EE
M6 x 35 Bolt
8 PCS
FF
M6 Nut
8 PCS
Fig.5: Insert the slanted beam (F1) into the lower tube (G1).
Fig.6: Insert the top end of the slanted beam into the top connector (I1), then assemble the hook (K) on the top connector.
Fig.6-1: Secure the assembled the slanted beam to the post with flat washers (BB) and nuts (FF).
Fig.7: Insert the
middle beam 1
(D1) into the
middle beam
2 (D2).
Fig.7-1: Insert the top end of the middle beam 1 (D1) into the top connector (I1).
Fig.8: Secure the middle beam 2 (D2) to the connector (E) with bolts (EE), flat washers (BB) and nuts (FF).
Fig.9: Slide large canopy (O1) over the roof structure, but do not extend it fully at this stage. Insert the small slanted
beam (H1) into the small connector (J1).