i
TABLE OF CONTENTS
Page
Safety PrecautionS .........................................................................................v
1. introDuction ...................................................................................................1
1.1 Description of operation ...........................................................................1
1.2 System Definitions ....................................................................................1
1.3 unit nomenclature ....................................................................................1
1.4 Description of components .......................................................................5
1.4.1 Power Packs ..................................................................................5
1.4.2 ionizers ..........................................................................................5
1.4.3 collector cells ...............................................................................5
1.4.4 filters .............................................................................................5
1.4.5 Junction Boxes ..............................................................................5
1.4.6 other equipment ...........................................................................5
2. inStaLLation PLanninG .................................................................................5
2.1 Location .....................................................................................................5
2.2 clearances ................................................................................................5
2.2.1 component access .......................................................................5
2.2.2 electrical enclosure access ..........................................................5
2.2.3 Bottom Working clearance ...........................................................5
2.3 Supports ....................................................................................................6
2.3.1 Skidded Systems ...........................................................................6
2.3.2 unskidded Systems .......................................................................6
2.3.3 utilities/Drains ................................................................................6
2.3.4 Ducting ..........................................................................................6
3. inStaLLation .....................................................................................................6
3.1 receiving inspection .................................................................................7
3.2 unloading by forklift .................................................................................7
3.3 unloading by crane ..................................................................................7
3.4 unit Storage/Delay to System installation.................................................8
3.5 installing the System .................................................................................8
3.5.1 PSH Systems ................................................................................8
3.5.2 Gaskets .........................................................................................8
3.5.3 inlet.outlet Plenums ......................................................................8
3.5.4 Motors/Blowers ..............................................................................8
3.5.5 Pre-conditioning equipment..........................................................8
3.5.6 order of installation .......................................................................8
3.5.7 Leveling .........................................................................................9
3.5.8 Blowers with Vibration isolators ....................................................9
3.5.9 Drain Pipe connections .................................................................9
3.5.10 Wash Water Supply connection ..................................................10
3.5.11 electrical field Wire installation ...................................................10