OPERATION
11
Surface Prep
Division
P: 877-817- 6687 F: 813-621-7125
Visit us at www.ussaws.com
8 TRANSPORT
The device can be moved effortlessly thanks to the four stable transport rollers.
To prevent unintentional rolling away, two castors can be secured with a brake.
9 STORAGE
The unit should be stored in a dry place where it is protected against freezing.
10 DISPOSAL
Do not open worn out machines and return to the collection facilities for recycling.
11 MAINTENANCE
-The ventilation slots on the motor casing should be cleaned out from tie to time.
- When the carbon brushes are worn out, the machine switches itself off. The machine must then be sent to customer services for mainte-
nance (see enclosed sheet)
-After approx. 100 hours of operation, check the motor brushes and replace if necessary. Clean the motor housing.
-After approx. 200 hours of operation, renew the grease filling in the gearbox.
To verify that the protective insulation remains intact machine must be subjected to a technical safety test afterwards. For this reason, this
work must be performed exclusively by a professional electro - electro-workshop.