USER GUIDE
u-line.com
First Use
Temperature displayed reflects actual
temperature inside unit.
NOTICE
Before attempting to fill the keg it is necessary to
confirm system is not pressurized.
1.
Shut off nitrogen tank by turning handle clockwise until
it stops.
2.
Lift up on pressure release valve ring. Allow pressure to
release.
3.
Detach hoses from keg. (See General Installation
section of this guide.)
Initial startup requires no adjustments. If the unit was
turned off, press and hold for 5 seconds to turn unit on.
See “Control Operation” section for more details.
If the temperature displayed is different than selected, the
unit is progressing towards the selected temperature. Time
to reach set point varies based upon ambient temperature,
temperature of product loaded, door openings, etc. U-Line
recommends allowing the unit to reach set points before
loading.
To dispense cold coffee, make sure the components are
assembled according to the instructions in GENERAL
INSTALLATION.
NOTICE
DE-PRESSURIZE SYSTEM
First Use
Fill the Keg
4.
Remove keg from refrigerator.
5. Lift handle and remove lid.
6.
Fill keg with cold brew.
7.
Replace and lock down lid.
8.
Reattach hoses.
Set Nitrogen Pressure
The pressure should be set around 20 - 30 PSI. Start at 25
PSI on regulated gauge; 7 PSI at infuser regulator.
1.
Make sure red regulator valve is in the OFF position.
2.
On top of Nitrogen tank, turn black handle
counterclockwise until it stops.
3.
Rotate the red regulator valve to ON Position; turn
counterclockwise 1/4 turn until it stops
14