![U-Line U-CO1175B-00 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/u-line/u-co1175b-00/u-co1175b-00_installation-manual_830157022.webp)
20
u-line.com
CAUTION
!
Failure to connect water supply or drain line connections
properly can result in personal injury and property
damage. Gravity drain connections must be routed
downward from the rest of the unit at the rate of 1/4" per
foot.
Factory Installed Drain Pump
• If your drain line will run up to a stand pipe, disposal or spigot
assembly, or does not otherwise meet the requirements for a
gravity drain, you may have ordered the CLR2160 or
CLRCO2175 with a pre-installed U-Line P60 drain pump.
• If you need to install a P60 drain pump into your unit, see
Locally Installed Drain Pump on page
21.
• See below for typical installations requiring a drain pump.
NOTICE
The maximum lift for the P60 drain pump is 10 feet. This
must be done as close to the rear of the unit as possible.
NOTICE
Before installing your U-Line CLR2160 or CLRCO2175
with factory-installed U-Line P60 pump, it is extremely
important to check and test all hose connections at the
drain pump.
Test Hose Connections:
1. Place a suitable container beneath the pump’s discharge tube.
The container must be able to hold a minimum of one gallon.
2. Plug the ice maker power cord into a properly grounded,
polarized electrical outlet.
3. Place the unit into OFF mode by holding the power key for 10
seconds. Failure to power down the ice maker will cause it to
begin a fill cycle which will run for 3 minutes.
4. Verify pump operation by pouring one gallon of water into the
ice storage bin of the ice maker. The pump should energize and
pump the water into the container.
5. At this time, verify that all tube and clamp connections are tight
and leak-free.
6. Unplug unit power cord from electrical outlet.
Cold
Water
Hot
Water
Waste
Waste
Shut-Off
Valve
Stand Pipe
P60 Pump Required
Air Gap
(Optional Hook-Up)
Cold
Water
Hot
Water
Waste
Shut-Off
Valve
Disposal Assembly
P60 Pump Required
Waste
Cold
Water
Shut-Off
Valve
Hot
Water
Air Gap
(Optional Hook-Up)
Y-Branch Tailpiece
P60 Pump Required