background image

PAGE 1 OF 3

 

0521 IH-4810

LOCKER LOCKS

1-800-295-5510

uline.com

H-4810, H-4811

INSTALLATION

1.  Above the handle on the front of the locker, locate the three 

circular indents. The middle circle will be larger than the top 
and bottom circles. (See Figure 1)

2.  Open door. From inside, remove the two nuts and washers 

holding on the steel plate using a 7mm wrench. Remove the 
two bolts from the front. (See Figure 2)

NOTE: For Six Tier Uline Industrial Lockers, steel plate is 
attached to door with rivets. To remove, use a power drill 
and drill bit to drill out the two rivets holding on the steel 
plate.

3.  To install locker lock, set dial at 0 and remove rear mounting 

plate of locker lock. Put rear mounting plate up against the 
inside of the locker door and the front of the lock up against 
the outside of the door. Push the two pieces together so that 
mounting bolts stick out through the mounting plate. Secure 

with nuts and tighten using an 8mm wrench. (See Figure 3)

TOOLS NEEDED

7mm Wrench

Figure 1

Figure 2

Figure 3

8mm Wrench

Para Español, vea página 2.

Pour le français, consulter la page 3.

Отзывы: