![U-Line CDE224B Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/u-line/cde224b/cde224b_quick-start-manual_3089232008.webp)
QUICK START GUIDE
8
USER GUIDE
u-line.com
General Installation
The following components are shipped inside the unit:
1. Triple Tower (faucets, handles, & hardware)
2. Nitrogen hose (connecting hardware)
3. Infuser regulators (mounting hardware)
4. Liquid jumper lines (with in-line filters) and gas jumper line
5. Drip tray
6. Cleaning solution (2-ounce packet)
(Additional cleaner, ULACOFFEECLEAN, is available at u-line.com)
7. Four casters (2 locking, 2 non-locking)
Safety and Warning
Keep nitrogen tank in an upright position and
handle with care.
Never exceed 60 PSI.
Ventilate area after nitrogen leak.
Required (not included):
1. Food grade nitrogen - available at your local
gas supplier. 22 cubic feet aluminum empty
tank (ULANITROTANK) and nitrogen regulator
(ULANITROREG) are
available at u-line.com.
Note: If using an external
nitrogen source, see
CONNECTING EXTERNAL
NITROGEN SOURCE
section.
2. Food-grade lubricant if
connecting to external
nitrogen source
3. Your favorite cold coffee or tea
General Installation
WARNING
!
1
2
3
4
5
6
7