EVK-G31, EVK-G35 - User Guide
UBX-13001792 - R06
Early Production Information
Starting up
Page 10 of 22
DIL B2B J401
DIL B2B J400
Signal Name
Pin N° Pin N°
Signal Name
Signal Name
Pin N° Pin N°
Signal Name
Not connected
2
1
GND
Not connected
2
1
GND
Not connected
4
3
V_BCKP
Not connected
4
3
Not connected
Not connected
6
5
Not connected
Not connected
6
5
Not connected
GND
8
7
GND
VCC
8
7
VCC
GND
10
9
GND
VCC
10
9
VCC
DTR
12
11
DCD
Not connected
12
11
Not connected
CTS
14
13
RTS
SIM_IO
14
13
VSIM
RXD
16
15
TXD
SIM_RST
16
15
SIM_CLK
DSR
18
17
RI
Not connected
18
17
Not connected
RXD_AUX
20
19
TXD_AUX
RSVD_#27
20
19
Not connected
Not connected
22
21
GND
RSVD_#36
22
21
RSVD_#26
RSVD_#19
24
23
SIM_DET
RSVD_#35
24
23
RSVD_#37
Not connected
26
25
RSVD_#25
RESET_N
26
25
RSVD_#34
RSVD_#17
28
27
Not connected
Not connected
28
27
Not connected
Not connected
30
29
PWR_ON
Not connected
30
29
Not connected
32K_OUT
32
31
RSVD_#23
Not connected
32
31
Not connected
Not connected
34
33
RSVD_#16
Not connected
34
33
Not connected
V_INT
36
35
Not connected
Not connected
36
35
Not connected
Not connected
38
37
Not connected
Not connected
38
37
Not connected
Not connected
40
39
Not connected
Not connected
40
39
Not connected
GND
42
41
GND
GND
42
41
Not connected
Table 7: Pin-out of the 42-pin Dual-In-Line Board-to-Board connectors (J401, J400) available on the adapter board ADP-G310 of
the EVK-G31 evaluation kit for SARA-G310 modules
The pins / interfaces that are not supported by a specific SARA-G3 module product version should be not
driven by an external device (see the
SARA-G3
series Data Sheet
[3] and
SARA-G3 and SARA-U2 series
System Integration Manual
[4] for the features supported by each SARA-G3 module product version).
1.8
Software installation
The USB driver can be downloaded from the Web; see the
EVK-G3x
Quick Start card
[5] for the URL. Save the
executable file to any location of the hard drive on the computer. The installation can be started by running the
executable file on the computer running the Windows operating system.
1.9
Board setup and settings
1
Insert a SIM card into the
SIM card holder
(J300).
2
Connect the cellular antenna provided with the evaluation kit box to the
Cellular antenna
SMA connector
(J100 on ADP-G3xx, RF input/output for transmission and reception of 2G RF signals).