background image

6

Acceptance and transportation

EN Floor grinding machine FGE 530

12

6

Acceptance and transportation

Follow the safety instructions in Chapter 2.

6.1 Machine acceptance

The packaged machine is supplied complete from the

manufacturer.
1.

Unpack machine and check the delivery slip to

make sure all parts are delivered.

2.

Check for any transportation damage.

3.

In case of damage, contact the transport com­

pany promptly.

4.

Report any problems to the manufacturer imme­

diately.
Complaints at a later date cannot be acknowled­

ged!

6.2 Transporting the machine

Risk of injury from heavy parts!

Suspended loads can fall or tip over, causing

serious injuries!
Do not stand under suspended loads!

Raising and lowering the load must be perfor­

med by two persons!

Do not raise loads any higher than necessary!

Prevent the load from swinging back and forth!

Keep sufficient safety distance.

Devices for stopping and transporting the unit

have to be rated to handle its full weight and

dimensions.

Observe weight data on packaging or in the ac­

companying documentation.

Never walk or reach beneath the load while it is

being lowered.

Wear safety shoes!

Wear safety gloves!

Proceed with the greatest care and caution!
For longer transports or longer storage, the ma­

chine needs to be covered to protect against

soiling.

For transporting, the machine can be taken apart into

2 pieces. A relocation over shorter distances is possi­

ble on the transport wheels.
1.

Decommission the machine (

!

Chapter 4.7)

2.

Either
a.

Fasten all loose parts to the frame.

b.

Move the machine to the respective loca­

tion with the transport wheels [6, Fig. A]

and deposit.

or
a.

Unplug the plug connection [35, Fig. J],

Hose connection [23, Fig. K] and if neces­

sary connection to the dust extrac­

tion [24, Fig. K].

b.

Loosen the 4 screws [36, Fig. L] as far as

possible without removing, so that the bolts

[37, Fig. M] are movable.

c.

Push the bolts into the open position [Fig. M].

d.

Disconnect drive from the frame.

e.

If necessary (e.g. for lorry transport), screw

the 4 screws [36, Fig. L] tightly and fasted

all loose parts on the frame.

f.

Move drive and frame to the respective lo­

cation and deposit.

g.

If necessary, lift drive and frame onto a sui­

table transport device (e.g. a palette). If

necessary, use suitable lashing gear (belts

or ropes).

Always secure the machine according to regula­

tions during lifting or transport by a vehicle or

suitable devices and strap down with tension

belts.

Содержание FGE 530

Страница 1: ...1 10999150_en EN Floor grinding machine FGE 530 Translation of the original operating manual 4...

Страница 2: ...2 9 4 6 2 7 10 1 8 Fig A 5 3 11 Fig B 13 12 18 16 17 14 2 15 19 14 Fig C 22 Fig D 21 20...

Страница 3: ...3 26 27 25 Fig F 28 29 Fig G 31 30 Fig H 33 34 50 max 13 3 Fig I 4 35 Fig J 24 Fig K 23 8 7 Fig L 36 38 37 Fig M...

Страница 4: ...ance 9 4 1 Customer service and spare parts 9 4 2 Tilt machine 9 4 3 Mounting and dismantling ETX diamond tools 9 4 4 Mounting and dismantling surface mills 10 4 5 Cleaning the machine 10 4 6 Checking...

Страница 5: ...Liability or warranty is excluded if The instructions in the operating manual have not been observed The machine or its attachments were improperly operated The maintenance was carried out inadequate...

Страница 6: ...res must be checked for comple teness and function before starting up The safety fixtures must be mounted during operation The surfaces to be processed by the machine need to be free of obstacles Risk...

Страница 7: ...e worn 3 1 Starting up the machine Follow the safety instructions in Chapter 2 The initial start up of the machine may be car ried out only by qualified personnel A visual inspection of the machine ne...

Страница 8: ...ide handle 1 Fig A 3 Sling safety line 19 Fig C around the wrist so that when the operator goes away from the guide handle 1 Fig A the safety cap 14 Fig C will be reliably separated from the safety sw...

Страница 9: ...Customer service and spare parts In case of customer service queries replacement parts or repairs please contact the manufacturer To ensure your queries are dealt with as quickly as pos sible always...

Страница 10: ...If surface mills are being used the speed SPEED may not exceed 50 Chapter3 2 4 5 Cleaning the machine 1 Tilt the machine Chapter 4 2 2 After using the machine and tools clean and dry them with a clot...

Страница 11: ...the rotary switch FWD 0 REV 16 Fig B to 0 3 Unlock the EMERGENCY STOP button afterwards When using an extraction the suction housing sucks itself to the floor There is not adequate clearance bet ween...

Страница 12: ...s being lowered Wear safety shoes Wear safety gloves Proceed with the greatest care and caution For longer transports or longer storage the ma chine needs to be covered to protect against soiling For...

Страница 13: ...lue 2 5 determined under standardised manufacturer ope ration conditions according to measuring method HARM 8 Declaration of conformity TYROLIT Hydrostress AG Witzbergstrasse 18 CH 8330 Pf ffikon ZH S...

Страница 14: ...TYROLIT Hydrostress AG Witzbergstrasse 18 CH 8330 Pf ffikon ZH Switzerland Telefon 41 0 44 952 18 18 Telefax 41 0 44 952 18 00 URL www tyrolit com...

Отзывы: