Bench valance (
Box
1):
•
Insert the bench valance between the right and left wall panel sections.
•
Connect the S-3 electrical supply to the S-3 junction box.
•
Fix the cover of the S-3 junction box with 2 Phillips screws.
Slide the fan component (
Box 1
) into
the support on the bench valance.
Connect the white connection on the black
junction box to the white connection on the fan.
Black main junction box: (2) connections
Locate the black main junction box that is fixed to the internal floor of the sauna.
1 Insert the 24 pin, multicoloured cable plug into the left hand side of the main junction box.
See point 3 -
Input/output
2 The ON/ OFF switch is on the right hand side of the main junction box.
Set the switch as shown above to the
ON
(
EIN
) position.
3 Connect the loudspeaker input and output.
Note – Do NOT insert the 230 volt alternating current cable into the socket yet.
Page 6
Содержание Prime+ 1811
Страница 9: ...Door handles Inside Outside Your infrared sauna is now ready for use Page 9 ...
Страница 12: ...Wiring Diagram Page 12 ...
Страница 21: ...Dörrhandtag Insida Utsida Nu är infravärmekabinen klar att använda Sidan 9 ...
Страница 24: ...Kopplingsschema Sidan 12 ...
Страница 36: ...Schéma électrique Page 12 ...
Страница 45: ...Türgriffe Innenseite Außenseite Ihre Infrarot Wärmekabine ist jetzt einsatzbereit Seite 9 ...
Страница 48: ...Wiring Diagram Seite 12 ...
Страница 58: ...Дверные ручки Внутренняя сторона Внешняя сторона Теперь инфракрасная кабина готова к использованию Стр 10 ...
Страница 61: ...Схема электрических соединений Стр 13 ...