STEP 8:

  Install the black DIN Rail adapter bracket to the back of the  

AC/DC power supply using the five screws provided and install the con-

troller and AC/DC power supply to the enclosure by hanging on welded 

DIN rails on either side of enclosure between batteries and door. 

 

Note: 

When attaching controller and power supply onto the DIN rails, 

first put the bottom of the bracket against the DIN rail and then push the 

part upward and over the top of the DIN rail. To remove, just reverse 

the process.

 

Remove the large green connector from the controller. Connect the bat-

tery cables to the controller BAT+ and BAT–

 

inputs. Connect the ther-

mostatically controlled fan to the controller BAT+ and BAT–

 

inputs. 

 

Note: 

Do not re

-

install the large Green connector until all wiring is com-

plete and you are ready to power up the system.

 

STEP 9:

  Set the AC/DC power supply input voltage to either 115VAC 

or 230VAC by moving the screw attached cable to the appropriate posi-

tion. 

 

WARNING! 

Make sure this is set correctly before connecting the 

AC line or you will damage the power supply. 

 

STEP 10:

  Connect the  from the power supply to the PV+ po-

sition on the large Green connector. Connect the  Output 

-

 from the 

power supply to the PV 

-

 on the large Green connector. 

 

WARNING!  

Be sure to make sure the polarity is correct before 

powering the system or you will damage the controller.

 

STEP 11:

  Connect your AC input wires to the power supply at the 

screw terminal labeled LNG. L=Load, N=Neutral, G=Ground  

 

STEP 12:

  Connect your equipment to the controller and finish up any 

wiring to your equipment then re

-

install the fuses in the battery cables. 

 

STEP 13:

  Plug the large Green connector to the controller.  The Bat-

tery Charging LED will light for about 60seconds when power is first 

applied, then there will be no LED lit until some changes are made to 

the controller web interface. 

 

STEP 14:

  Turn on AC power to the AC/DC power supply.  You should 

see the Battery Charging LED turn on. The LED will be steady state 

when the batteries are charging and will be flashing when the controller 

is in float charge mode.

 

STEP 15:

  Connect the controller to your network through one of the 

switch ports, preferably port 7. T

he default IP address is 192.168.1.6 

The unit may also get an IP address from a DHCP server. We have a 

free discovery tool available at 

http://tyconsystems.com/index.php/

support/tpdin

-

firmware 

This tool will find the controller no matter what IP 

address it is on even across subnets. 

 

Содержание UPS-STL48-50

Страница 1: ... lights and power circuits Contact with power lines lights or power circuits may be fatal We rec ommend to install no closer than 20 feet to any power lines Safety For your own protection follow these safety rules Perform as many functions as possible on the ground Do not attempt to install on a rainy windy or snowy day or if there is ice or snow accumulation at the install site or if the site is ...

Страница 2: ...ket to the pole using U Bolt and or Pole Straps STEP 4 Attach The two 8mm bolts that hold the bottom bracket to the enclo sure Make sure all bolts are tight 8 15 ft lbs STEP 5 Install the three wire feedthru cable glands in the holes in the bottom of the enclosure If one or more of the cable glands will not be used just cut a short piece of wire and tighten in the cable gland NOTE The bottom plate...

Страница 3: ...ross one of the batteries in the array STEP 7 Before attaching the battery cables to the batteries first re move the battery cable fuse This will prevent accidental short circuit Connect the battery cables to the batteries Con nect the Temperature probe from the controller to any of the battery terminals The temperature sens ing lug is just a mechanical connection so it doesn t matter which termin...

Страница 4: ...po sition on the large Green connector Connect the Output from the power supply to the PV on the large Green connector WARNING Be sure to make sure the polarity is correct before powering the system or you will damage the controller STEP 11 Connect your AC input wires to the power supply at the screw terminal labeled LNG L Load N Neutral G Ground STEP 12 Connect your equipment to the controller an...

Страница 5: ...elow a set value This value can be set in the user inter face This low voltage disconnect function is needed to preserve the life of the batteries SPECIFICATIONS Subject to change without notice UPS STL48 50 UPS STL48 100 Load Voltage 24V 48V Selectable 24V 48V Selectable Max Load 200W 200W VAC Input 10 115 230VAC user selectable VAC Input Current 12A 115VAC 6A 230VAC Max Battery Capacity 200Ah 40...

Страница 6: ...ds to the controller voltage output This output will discon nect the load if the battery voltage drops below the set voltage and this will protect the battery from over discharge If batteries get completely discharged because the equipment was connected directly to the bat tery you will reduce the battery life Discharged batteries will freeze at very low temperatures 7 ACCESSORIES Tycon also offer...

Страница 7: ...7 ...

Страница 8: ...8 8000050 Rev 3 UPS STL UPSPro Qwik Install Guide ...

Отзывы: