Shut
-
down Procedure
You are now ready to power down your systems and prepare them for
placement in their final destinations.
O Go to each wall
-
pack PoE injector and unplug from the wall outlet.
O You may now disengage the CAT5/6 jumper cables.
O You are now ready to install the Antennae and cabling.
——
Be sure to observe all of the warnings and safety precautions in the User Manual ——
O Go to the installation section of the User Manual and follow the
steps for mounting the Antennae.