Tycon Systems
14641 S 800 W
Bluffdale UT 84065
tyconsystems.com Page 1
EZ
-
Bridge ®
-
LT2 Series Initial Set
-
Up Procedure and Checklist
Thank you for choosing the EZ
-
Bridge® Wireless Antenna System.
Each Antenna system is factory tested and pre
-
configured so that most applications
are truly
“
Plug and Play
”
Some package models will require additional user
-
provided Ethernet Cat5/6 jumper cables to
complete the necessary connections between each Antenna, each PoE Injector and your
Network Devices.
O Unbox all system components within the same room on a non
-
conductive table or floor.
O Identify and keep separate Antenna
“
A
”
and Antenna
“
B
”
as each will be initialized separately.
(The PoE wall pack injectors are identical and may be used with either antenna)
Step One: Begin set
-
up procedure for Antenna
“
A
”
—
With the PoE wall
-
pack injector
unplugged
from AC power —
O Remove the bottom cover from the antenna housing to access the connection points.
O Insert one end of a CAT5/6 jumper cable into the center RJ45 port.
(Center Port aligns with the cover)
and the other end into the
“
PoE
”
port of the injector as shown.
IMPORTANT! Before installing any devices, please read all of
the cautions and warnings contained in the system manual.
Warning! These antennas utilize (12 –
24
VDC)
Do not connect to Standard PoE Power Sources.
Higher voltages will damage units and void
the warranty
O
With another CAT5/6 jumper cable, insert one end into the
“
LAN
”
port of the
Injector and the other end into a spare data port of your Switch or Router that is
Connected to an Internet source as shown at the top of page 2.
Cat 5/6
Jumper
7 August 2019