Tyco AMD-3 Скачать руководство пользователя страница 4

TFP1241

Page 4 of 4

NATIONAL FIRE PROTECTION ASSOCIATION and NFPA are registered trademarks of National Fire Protection Association

1400 Pennbrook Parkway, Lansdale, PA 19446 | Tel1-215-362-0700

© 2018 Johnson Controls. All rights reserved. All specifications and other information shown were current as of document revision date and are subject to change without notice.

NITROGEN CYLINDER 

REPLACEMENT PROCEDURE 

Replace the nitrogen cylinder in accor-

dance with the  following instructions.

Step 1.

 Close the control valve in the 

air supply trim to the system.

Step 2.

 Close the Cylinder Control 

Valve.

Step 3.

 Remove the Model AMD-3 

Device from the Cylinder Control Valve 

by slowly unscrewing the inlet connec-

tion to the Pressure Regulator.

Step 4.

 Following the steps outlined in 

the caution below, replace the nitrogen 

cylinder.

CAUTION

The following instructions with regard 

to the nitrogen cylinder must be strictly 

followed. Failure to do so may result in 

personal injury or property damage.
Step A. Secure the cylinder to a wall or 

post, ensuring that it will not tip or fall if 

accidently bumped.
Step B. Inspect the Cylinder Control 

Valve outlet for dirt, dust, damaged 

threads, oil, or grease. Remove dirt 

and dust with a clean cloth. If damaged 

threads, oil, or grease are present, 

replace the cylinder.
Step C. Inspect the Pressure Regulator 

inlet for dirt, dust, damaged threads, 

oil, or grease. Remove dirt and dust 

with a clean cloth. If damaged threads, 

oil, or grease are present, have the 

pressure regulator serviced by an 

authorized agent of the Victor Equip-

ment Company.
Step D. With the cylinder securely in 

place and while standing to the side 

or rear of the Cylinder Control Valve, 

momentarily crack open the Cylin-

der Control Valve. This procedure is 

intended to blow out any foreign matter 

that may be inside the valve outlet.
Step E. Attach the Model AMD-3 

Device to the Cylinder Control Valve 

and securely wrench-tighten.

Step 5.

 Open the Cylinder Control 

Valve in accordance with Step 4 in the 

Operating Procedure section.

Step 6.

 Open the control valve in the 

air supply trim to the system.

Step 7.

 Check the Pressure Regulator 

connection for leaks.

Limited  

Warranty

For warranty terms and conditions, visit 

www.tyco-fire.com.

Ordering  

Procedure

Contact your local distributor for avail-

ability. When placing an order, indi-

cate the full product name, including 

description and Part Number (P/N).

Model AMD-3 Device

Specify: Model AMD-3 Automatic 

Nitrogen Maintenance Device,  

P/N 52-328-2-001

Replacement Parts

Specify: (description) for use 

with the Model AMD-3 Automatic 

Nitrogen Maintenance Device, 

P/N (Ref. Figure 1)

Содержание AMD-3

Страница 1: ...ion Failure to do so may impair the perfor mance of these devices The owner is responsible for main taining their fire protection system and devices in proper operating con dition Contact the installing contrac tor or product manufacturer with any questions Technical Data Approvals UL and C UL Listed FM Approved NYC Approved under MEA 206 02 E Maximum Inlet Nitrogen Supply Pressure 3000 psi 200 ba...

Страница 2: ...in the air supply trim of TYCO dry pipe valves preaction valves and dry pilot trim Step 5 Following the steps outlined in the caution below install the nitrogen cylinder CAUTION The following instructions regarding the nitrogen cylinder must be strictly fol lowed Failure to do so may result in personal injury or property damage Step A Secure the cylinder to a wall or post ensuring it will not tip ...

Страница 3: ...ssion to shut down the affected fire protection system from the proper authorities and notify all personnel who may be affected by this action It is recommended that a spare supply of nitrogen be kept on hand Make no attempt to field repair or replace any component of the Pres sure Regulator Inspections should be made more frequently after the system is initially placed in service to develop a gui...

Страница 4: ...t and dust with a clean cloth If damaged threads oil or grease are present replace the cylinder Step C Inspect the Pressure Regulator inlet for dirt dust damaged threads oil or grease Remove dirt and dust with a clean cloth If damaged threads oil or grease are present have the pressure regulator serviced by an authorized agent of the Victor Equip ment Company Step D With the cylinder securely in p...

Отзывы: