Chapter 2: Setting Up
27
Note:
The FDD rails each have a flat side which should be
against the body of the floppy drive when installed. There is
also a spring catch mechanism on the right hand rail (when
looking at the floppy disk drive from the front).
3. Plug the FDD power and data cables into the ports on the
back of the floppy disk drive.
4. Thread the cables out through the back of the empty
drive bay. Slide the floppy disk drive into the drive bay
until it clicks into place and fits flush with the front panel.
Содержание Tank TA26 B5397
Страница 1: ...Tank TA26 B5397 Service Engineer s Manual...
Страница 2: ......
Страница 14: ...6 Chapter 1 Overview Screw Pack Sliding Rail FDD Rails FDD Power Cable TYAN Logo...
Страница 17: ...Chapter 1 Overview 9 1 5 4 Motherboard Layout...
Страница 19: ...Chapter 1 Overview 11 1 5 6 System Block Diagram...
Страница 24: ...16 Chapter 2 Setting Up 3 Unscrew the fan duct...
Страница 27: ...Chapter 2 Setting Up 19 6 Place theheatsink on top of the CPU and secure with four screws as shown below...
Страница 30: ...22 Chapter 2 Setting Up The following chart outlines the suggested rules for populating memory...
Страница 42: ...34 Chapter 2 Setting Up NOTE...
Страница 47: ...Chapter 3 Replacing Pre Installed Components 39 3 Unscrew the fan duct...
Страница 72: ...64 Chapter 3 Replacing Pre Installed Components NOTE...