Chapter 3: Replacing Pre-Installed Components
45
2. Remove the ten screws to release the backplane.
3. Turn the locking keys at the base of the backplane as
shown.
4. Pull out the backplane.
5. Place a new backplane in position and secure in place
with the ten screws and locking keys released in step 2
and 3.
6. Reconnect all the cables to the backplane.
Содержание Tank TA26 (B5383) Service
Страница 1: ...Tank TA26 B5383 Service Engineer s Manual...
Страница 2: ......
Страница 14: ...6 Chapter 1 Overview Screw Pack Sliding Rail FDD Rails FDD Power Cable TYAN Logo...
Страница 17: ...Chapter 1 Overview 9 1 5 4 Motherboard Layout...
Страница 19: ...Chapter 1 Overview 11 1 5 6 System Block Diagram...
Страница 40: ...32 Chapter 2 Setting Up...