http://www.tyan.com
25
6.
Remove the PnP cap. Use your left hand to hold the load plate.
Then use your right thumb to remove the PnP cap from the load plate.
With the package in the socket, the PnP cap removal process will not
damage the contacts.
7.
Close the socket. Rotate the load plate onto the package lid.
Engage the load lever while pressing down lightly onto the load plate.
Secure the lever near the hook end under the retention tab.
8.
Repeat this procedure for the second processor if necessary.
Содержание S3970
Страница 4: ...http www tyan com 4 NOTE...
Страница 9: ...http www tyan com 9 2 2 Block Diagram Thunder h1000E Tomcat h1000E Block Diagram...
Страница 12: ...http www tyan com 12 J22 J6 J2 J35 J4 J3 J23...
Страница 14: ...http www tyan com 14 J29 J36 J24...
Страница 16: ...http www tyan com 16 J26 J25 J21...
Страница 18: ...http www tyan com 18 JP8 JP3 JP2 JP1 JP6...
Страница 36: ...http www tyan com 36 NOTE...
Страница 78: ...http www tyan com 78 NOTE...
Страница 82: ...http www tyan com 82 NOTE...